Sadok TURKI

Dr. Sadok TURKI

Laboratory of Informatics Engineering, Production and Maintenance (LGIPM), Lorraine University, Nancy, France
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2018 in Journal of Cleaner Production
Verified
Journal Article
Closed access
Sadok TURKISadok TURKI
Sadok TURKI
CSChristophe Sauvey
Christophe Sauvey
NRNidhal Rezg
Nidhal Rezg

7 April 2017 in Sustainability
Verified
Journal Article
Open access
PDF file
Sadok TURKISadok TURKI
Sadok TURKI
SDStanislav Didukh
Stanislav Didukh
CSChristophe Sauvey
Christophe Sauvey
NRNidhal Rezg
Nidhal Rezg
This paper deals with the optimization of a manufacturing–remanufacturing–transport–warehousing closed-loop supply chain, which is composed of two machines for manufacturing and remanufacturing, manufacturing stock, purchasing warehouse, transport vehicle and recovery inventory. The proposed system takes into account the return of used end-of-life products from the market. Manufactured and re-manufactured products are stored in the manufacturing stock. The used end-of-life products are stored in the recovery inventory for remanufacturing. The vehicle transports products from the manufacturing stock to the purchasing warehouse. The objective of this work is to simultaneously evaluate the optimal capacities of manufacturing stock, purchasing warehouse and the vehicle, as well as the optimal value of returned used end-of-life products. Those four decision variables minimize the total cost function. A discrete flow model, which is supposed to be the most realistic, is used to describe the system. An optimization program, based on a genetic algorithm, is developed to find the decision variables. Numerical results are presented to study the influence of transportation time, unit remanufacturing cost and configuration of the manufacturing/remanufacturing machines on the decision variables.

7 September 2018 in Sustainability
Verified
Journal Article
Open access
PDF file
Sadok TURKISadok TURKI
Sadok TURKI
NRNidhal Rezg
Nidhal Rezg
Due to environmental legislation pressure and the competition between manufacturing firms, a high number of production firms are obliged to collect and remanufacture used products. As a result, firm leaders and academic researchers are devoted to developing and managing new sustainable supply chains. Most of the published works in the literature assume that new and remanufactured products are of the same quality, and that all of the returned-used products are remanufacturable. However, in practice, new products are perceived as being of higher quality than remanufactured ones, and the remanufacturing depends on the quality of the returned-used products. This paper aims to bridge this gap in the literature by providing an optimal design for a manufacturing/remanufacturing system that differentiates between new and remanufactured products and sorts the used products into three quality levels. The objective is to determine the optimal storage capacities and production decisions regarding new and remanufactured products while considering carbon emissions. A model is developed to consider the above issues and determine the total profit. An evolutionary algorithm is developed to find the optimal values regarding store capacities and the remanufacturing periods of new and remanufactured products that maximize the total profit. Numerical results are provided to study the impact of the quantity and quality of returned-used products on the optimal values of store capacities, the remanufacturing periods of new and remanufactured products, and carbon emissions.

11 April 2013 in International Journal of Production Research
Verified
Journal Article
Closed access
Sadok TURKISadok TURKI
Sadok TURKI
SHSophie Hennequin
Sophie Hennequin
NSNathalie Sauer
Nathalie Sauer
In this paper, a manufacturing system composed of a single-product machine, a buffer and a stochastic demand is considered. Two models are presented: continuous and discrete flow models including constant delivery times, machine failures and random demands. The objective is to determine the value of the optimal buffer level, for a hedging point policy which minimises the total average cost function. The cost function is the sum of inventory, transportation and lost sales costs. Infinitesimal perturbation analysis is used for optimisation of the failure-prone manufacturing system. The trajectories of buffer level are studied for the continuous and discrete cases and the infinitesimal perturbation analysis estimators are evaluated. These estimators are shown to be unbiased and then they are implemented in an optimisation algorithm which determines the optimal buffer level in the presence of constant delivery time. Numerical results are presented for continuous and discrete flow models and then compared in order to evaluate the application of the infinitesimal perturbation analysis on the discrete flow model.

25 April 2018 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ZGZouhour Guiras
Zouhour Guiras
Sadok TURKISadok TURKI
Sadok TURKI
NRNidhal Rezg
Nidhal Rezg
Alexandre DolguiAlexandre Dolgui
Alexandre Dolgui
With an increase of environmental pressure on economic activities, reverse flow is increasingly important. It seeks to save resources, eliminate waste, and improve productivity. This paper investigates the optimization of the disassembly, remanufacturing and assembly system, taking into account assembly-disassembly system degradation. An analytical model is developed to consider disassembly, remanufacturing of used/end-of-life product and assembly of the finished product. The finished product is composed of remanufactured and new components. A maintenance policy is sequentially integrated to reduce the system unavailability. The aim of this study is to help decision-makers, under certain conditions, choose the most cost-effective process for them to satisfy the customer as well as to adapt to the potential risk that can perturb the disassembly-assembly system. A heuristic is developed to determine the optimal ordered date of the used end-of-life product as well as the optimum release dates of new external components. The results reveal that considering some remanufacturing and purchase components costs, the proposed model is more economical in comparison with a model without remanufactured parts. Numerical results are provided to illustrate the impact of the variation of the ordering cost and quality of the used end-of-life product on the system profitability. Finally, the risk due to system repair periods is discussed, which has an impact on managerial decision-making.

3 August 2014 in International Journal of Production Research
Verified
Journal Article
Closed access
ZHZied Hajej
Zied Hajej
Sadok TURKISadok TURKI
Sadok TURKI
NRNidhal Rezg
Nidhal Rezg
This paper develops and analyses a stochastic optimisation problem with a service level constraint for generating a sequentially optimal plan of production, maintenance and delivery activities in a deteriorating manufacturing system. Stochastic demand along with product returns are both assumed the latter of which allows for restocking products returned by the customer which are still new and thus in saleable condition. A constrained production/maintenance/delivery problem with service level, stochastic demand, delivery time, failure rate and product returned is formulated based on quadratic model. This quadratic formulation is adapted to provide an inventory, delivery, production and maintenance policies. The objective of this paper is to study the delivery time influence on the planning of the production, maintenance and delivery activities. Finally, we present simulation results to illustrate the exploitation of the proposed approach.