Open-channel junctions are critical design elements for many major and minor drainage infrastructures. Typical examples of these structural elements are encountered in stormwater drainage systems, urban water networks, irrigation, and natural or artificial waterways. The analysis of flow behavior and condition of those structures are of considerable use to engineers involved in the design and planning processes. However, these analyses are very challenging due to the interaction among the incoming junctional and main channel flow coupled with the functional parameters involved, such as the angle of confluence, channel width, cross-section, bed slope, flow direction, discharge, and wall roughness. Therefore, the aim of this paper is to illustrate the application of a finite volume/numerical analysis method to model stormwater flow conditions and separation zone at 45 and 90° of open-channel junctions. In general, the simulation results and analysis suggested that for a 90° junction the separation zone area and discharge ratio is indirectly proportional due to recirculating flow, low pressure, and minimum velocities near the T-junction and Y-junction’s areas. For a 45° junction, flow separation is the function of divergence angles and flow velocity. Statistical analyses were also applied using the chi-square test to verify the accuracy of the numerical model result used to investigate the dimensions of the separation zone.
Drainage system infrastructures in most urbanized cities have reached or exceeded their design life cycle and are characterized by running with inadequate capacity. These highly degraded infrastructures are already overwhelmed and continued to impose a significant challenge to the quality of water and ecological systems. With predicted urban growth and climate change the situation is only going to get worse. As a result, municipalities are increasingly considering the concept of retrofitting existing stormwater drainage systems with green infrastructure practices as the first and an important step to reduce stormwater runoff volume and pollutant load inputs into combined sewer systems (CSO) and wastewater facilities. Green infrastructure practices include an open green space that can absorb stormwater runoff, ranging from small-scale naturally existing pocket of lands, right-of-way bioswales, and trees planted along the sidewalk as well as large-scale public parks. Despite the growing municipalities’ interest to retrofit existing stormwater drainage systems with green infrastructure, few studies and relevant information are available on their performance and cost-effectiveness. Therefore, this paper aims to help professionals learn about and become familiar with green infrastructure, decrease implementation barriers, and provide guidance for monitoring green infrastructure using the combination of survey questionnaires, meta-narrative and systematic literature review techniques.
17 November 2014 in Journal of Water Supply: Research and Technology—AQUA
Accurate and reliable project cost estimates are fundamental to achieve successful municipal capital improvement (CIP) programs. Engineering cost estimates typically represent critical information for key decision makers to authorize and efficiently allocate the necessary funds for construction, budgeting, to generate a request for proposals, contract negotiations, scheduling, etc. for these reasons, cost estimators are using different estimating methods and approaches that allow for required levels of accuracy. As the project’s scope becomes more detailed and the potential risks are identified and/or the project design stage progresses these cost estimates are revised and updated. In this paper, the most common project cost estimation methods and approaches were collected and categorized into two main groups of (1) probabilistic and (2) deterministic methods. Under these groups overall ten different methods were identified and discussed addressing their requirements, advantages, and shortcomings, including the potential risk that can positively or negatively affect the project’s cost outcome. This paper will be a good resource for professionals who are in budget development and/or are seeking to a better understanding of different methods in determining an appropriate base cost margin and produce a meaningful and reliable project cost estimate.
1 February 2021 in Journal of Sustainable Water in the Built Environment
Forum papers are thought-provoking opinion pieces or essays founded in fact, sometimes containing speculation, on a civil engineering topic of general interest and relevance to the readership of the journal. The views expressed in this Forum article do not necessarily reflect the views of ASCE or the Editorial Board of the journal. Professional terminology improves communication efficiency, allowing concise conveyance of ideas, concepts, methods, and techniques. The term green infrastructure (GI) has been rapidly replacing low-impact development (LID) in urban and suburban areas, referring to design approaches that divert stormwater runoff into natural and seminatural features. However, the fundamental categories, concepts, and design methods upon which GI are grounded need to be clearly distinguished from existing applications and underlying principles of stormwater runoff management practices, such as LID and best management practices (BMP), to avoid the use of multiple terms to define similar concepts leading to contradiction and confusion. Therefore, the evolution of stormwater runoff management terminologies from 1975 to 2018 have been examined to explore the differences and similarities between GI and LID practices, including the history of GI and LID practices, the main watershed-scale application strategies and techniques, and the distinctions between GI and LID. The results of the comparative investigation are reported and recommendations provided, and then it is concluded that GI is merely a new phrase in stormwater management.