Obtaining a multi-resource allocation scheme for multi-task influenced by uncertain factors is a critical problem in collaborative logistics network. This paper presents an optimal allocation model of fuzzy resources for multi-stage random logistics tasks based on the six-point trapezoidal fuzzy number and the membership function. Besides, considering task demands and resource constraints, a new cost-time-quality multi-objective programming of N-N task-resource assignment is introduced, which can be divided into minimize total logistics cost and execution time, maximize total service quality. Furthermore, by setting the different simulation scenarios, the results show that if the decision maker has a higher risk preference and pursues the optimization of single or multi-objective, the higher degree membership and satisfaction function values can be gotten with a larger compensation coefficient. The allocation scheme of task-resource assignment generated by proposed model has a high global level of utilization efficiency, which can effectively utilize fuzzy resources in collaborative logistics network, and avoid resource shortage caused by the excessive occupation of local resources.
We analyse the direction of the energy revolution from the dimensions of cleanness, electrification, intelligence, and ubiquity. Based on this, we highlight the importance of electricity in the Energy Internet and analyse the challenges faced by the development of the power grid. Then, we propose an electricity-centered energy comprehensive optimization model and set up baseline scenario and carbon neutral scenario, to achieve a systematic simulation of the path of Energy Internet to boost energy transition. The results show that the Energy Internet accelerates the process of clean energy supply, effectively promotes the development of the energy transition, and contributes to the realization of the carbon neutral goal. There are still many problems in the development of the Energy Internet. In order to accelerate the transformation of the energy system and the power industry, it is necessary to establish a sound energy policy system, encourage clean energy consumption, and use the construction of the Energy Internet to achieve optimal allocation of resources.
Based on empirical evidence from Yangtze River Delta, Pearl River Delta and Circum-Bohai-Sea region, this study applies the Input-Output (I-O) model and ArcGIS to analyze the interdependence and its dynamic evolution of the shipbuilding industry. In order to study the change cause of shipbuilding industrial structure, we decompose the I-O model to obtain the influential factors including domestic final demand, overseas export demand, intermediate input, intermediate demand import and final demand import. The results indicate that (1) the shipbuilding industry has a significant interdependence, which has showed the characteristics of high integration and interaction. Among the three different regions, the degree of interdependence of the Yangtze River Delta is most significant, followed by the Pearl River Delta and the Circum-Bohai region. (2) The interaction and integration of the shipbuilding industry have the trend of synchronous development. From the initial S-shapes of coastal distribution, the interaction gradually expands to inland cities radially. (3) The dependence of the shipbuilding industry has reduced but the self-supporting effect continuously strengthened, and industrialization is accelerating, which indicates the shipbuilding industry will further promote the optimization of industrial structure. (4) Shipbuilding industry has been expanding a lot, the main causes of changes in industrial structure are different, and the effect of intermediate inputs change plays a significant role in the Yangtze River Delta. In the Pearl River Delta, it is the changes effect of foreign export demand that counts. However, it is the effect of the final demand that makes contribution to the industrial structure change in Circum-Bohai-Sea region.