The load-bearing capacity of a bidirectional laminated slab with shear keys arranged in a rectangular grid (BCSWSK) was investigated to determine its mechanical properties, using load tests on a fabricated laminated slab and finite element models. The shear force distribution across the shear keys was measured and analysed, and the effects of different parameters were identified. The interfaces between the cast bottom slab and the shear keys were strongly bonded, as was the interface between the precast bottom slab and the cast-in-place upper slab, despite it being a secondary concrete pouring. The shear force was distributed similarly along the X direction (columns) and the Y direction (rows) of the shear key arrangement. The shear forces along the Y direction were greater and reached a maximum value sooner, but the differences between columns were mostly less than 10%. A square cross-section is recommended for the shear keys. The number of rows, number of columns, and the cross-sectional area of the shear keys are the main factors influencing the mechanical properties of the composite slab, but as they individually increased, they reached a point at which further increase had little effect. Similarly, after a certain number of shear keys were used, the concrete grade cast in situ, the shear key concrete grade, and the friction coefficient between the precast bottom slab and the cast-in-place upper slab had little influence on the BCSWSK.
A prefabricated frame–shear wall structure is a major structure in an assembled building. To find a method of connecting a shear wall and columns that can both reduce the amount of wet work required and maintain adequate stiffness, we propose connecting the shear wall to the vertical frame using rectangular concrete-filled steel tube keys (RCFSTKs). Static tests of a cast-in-place frame–shear wall structure without keys and a prefabricated structure with RCFSTKs were conducted to compare their seismic performance. The feasibility of the new method was analyzed. Finite element models were then set up to determine if plain concrete blocks between RCFSTKs could be removed and to identify the influence of different parameters on the cyclic performance of the assembled structure. The results show that the use of RCFSTK is practical. Compared with a dimensionally similar cast-in-place shear wall–column construction, a prefabricated shear wall connected to columns by RCFSTKs has a fuller hysteresis curve, better ductility, slightly higher energy dissipation, and slightly slower degradation of stiffness and bearing capacity. The removal of inter-key concrete blocks significantly reduces bearing capacity and initial stiffness. The cyclic performance of the assembled structure is primarily influenced by the number of RCFSTKs, the thickness of the steel tube key wall, and the axial compression ratio, with less effect from key unit height, steel strength, and concrete grade in RCFSTKs.