In this paper, a simplified prediction formula of ground settlement induced by deep foundation pit excavation is proposed, especially suitable for ground overloading near a foundation pit, such as embankment surcharge load, which is carefully considered via the means of load equivalence. The ground settlement induced by foundation pit excavation and embankment surcharge load is determined by the modified skewness prediction formula and the simplified Boussinesq solution, respectively, and it is assumed that no coupling effect exists between the two settlement sources. In addition, this paper improves the determination of the maximum settlement location by combining calculus and curve fitting, replacing the existing prediction formula which relies heavily on engineering experience to determine the maximum settlement point. The predicted value obtained using this method comes close to the measured value, and the deviation of the maximum surface settlement value is controlled within about 5% in the three cases introduced, of which the accuracy is higher than the existing prediction formula.
This research examines the impact of soil heterogeneity on the bridge piles beneath a nearby tunnel excavation using Monte-Carlo stochastic analysis. Sensitivity analysis is specifically used to the variation of stratum range, variation coefficient (COV), and fluctuation distance of the soil Young’s modulus. Meanwhile, the reliability evaluation approach is also applied to systematically examine the impact of COV on the likelihood of a pile failing. The findings suggest that more consideration should be given to the degree and range of geological parameter variations in the strata surrounding the tunnel. The horizontal and vertical fluctuation distances in this project are predicted to be around 18 m and 4.5 m, respectively. The fluctuation range influences the frequency of low stiffness zones in the soil. Additionally, the variation coefficient has a significant effect on the pile deformation, presenting a positive association. The pile deformation exhibits an increasing tendency in the wake of the growing variation coefficient. More significantly, the increase of the COV will directly lead to a rising failure probability of the pile settlement. According to extensive Monte-Carlo simulation calculations, the simulation results considering the variability of soil parameters have a certain deviation from the deterministic in the perspective of probability statistics. It is quite necessary to attach importance to the soil heterogeneity effects in the pile foundation stability under construction disturbance.
This paper analyses the deformation and force behavior of a wood-piled island cofferdam based on the principle of equivalent bending stiffness. The horizontal deformation and bending moments in wood piles and the axial stress in tension bars on top of piles were both analyzed by the finite difference (FD) method. Except for the analysis of the cofferdam construction process, the influence of the pile length, the dam width, the tension bar interval, and the pile interval, among the commonly adopted parameters, were detailly examined in numerical simulations. In addition, a reinforced wood-piled cofferdam model by steel pipe piles has been established to quantify the effect of reinforcement. It was found that the dewatering inside the cofferdam was detrimental to cofferdam stability. The pile deformation reached maxima (roughly 0.6% of the pile length) at solidifying stage after dewatering. The changing trend of the cofferdam structure force within a safe district was consistent with the displacement. The dam width had a vital effect on the stability of the cofferdam, especially on the horizontal deformation. The steel pipe pile reinforcement scheme performed better in further deformation control, providing a new idea for island-type cofferdams with rigorous structural deformation control.