Yipei Zhang

Dr. Yipei Zhang


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 November 2023 in International Journal of Production Research
Verified
Journal Article
Closed access
YZYipei Zhang
Yipei Zhang
Feng ChuFeng Chu
Feng Chu
ACAda Che
Ada Che
YLYantong Li
Yantong Li

2 February 2023 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
Libiao BaiLibiao Bai
Libiao Bai
XHXiao Han
Xiao Han
YZYipei Zhang
Yipei Zhang
XXXiaoyan Xie
Xiaoyan Xie
A novel model is proposed for optimal project portfolio selection (PPS). Different from previous PPS methods that consider the interdependence, interaction, or synergy relationships among projects, this article considers the cascading failure process caused by these relationships. Specifically, we first construct a PP network (PPN) and determine the initial load and capacity of the projects (nodes). Afterward, we simulate the cascading failure process by attacking one or more projects in the PP and distribute the load of the failed projects to nonfailed neighboring projects. The cascading failure process ends until no project fails. Finally, we propose a new indicator to measure and compare each PPN's cascading failure results, based on which the optimal PP is selected. A numerical experiment is conducted to depict the PPS process. The results of this study provide guiding implications for project portfolio management decision-makers, helping them consider PPS problems from a new perspective and make more reasonable decisions.

25 October 2022 in IEEE Transactions on Intelligent Transportation Systems
Verified
Journal Article
Closed access
ACAda Che
Ada Che
WWWenjia Wang
Wenjia Wang
XMXiaohu Mu
Xiaohu Mu
YZYipei Zhang
Yipei Zhang
JFJianguang Feng
Jianguang Feng
The petrol station replenishment problem (PSRP) refers to the process of transporting petroleum products from oil depots to petrol stations via tank trucks. It mainly consists of two parts: allocating petroleum products to tank trucks and planning the travel route of each truck. In this study, we examine a new variant of PSRP by considering a multi-depot vehicle routing problem with open inter-depot routes (MDVRPOI). Each depot can act as an intermediate replenishment facility, and each truck can be reloaded at any depot any number of times within the working period. Moreover, trucks can end their routes at any depot instead of making a long empty drive to the start depot. The trucks are heterogeneous with multiple load-specific compartments. We formulate the problem as a mixed-integer linear programming (MILP) model. Given the problem’s complexity, a tabu-based adaptive large neighborhood search (T-ALNS) algorithm is proposed, which integrates the tabu search approach into ALNS to solve the problem effectively. The T-ALNS executes multiple problem-tailored destroy/repair operators on the station, trip, and route levels. A local search procedure with problem-specific operators and an adaptive strategy is further embedded into T-ALNS. We use the real data of an oil company in China to evaluate our algorithm. Computational results show that our T-ALNS significantly outperforms the CPLEX solver and other algorithms in terms of solution quality and computation time. Further, it realizes an average reduction in transportation cost of about 45% compared to the company’s actual strategy.

12 March 2024 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
Libiao BaiLibiao Bai
Libiao Bai
JLJiachen Lin
Jiachen Lin
QXQi Xie
Qi Xie
YZYipei Zhang
Yipei Zhang
XGXiqian Guo
Xiqian Guo
To reasonably allocate shared resources (SRs) in project portfolios (PP) and realize PP's maximal benefits, this research proposes a hybrid SRs allocation model based on system dynamics (SD) and discrete event simulation (DES). Unlike previous resource allocation methods that solely consider project level benefits, the proposed model simultaneously considers the benefits at both project and portfolio levels. Specifically, starting from the project activity level, we first construct a project schedule evaluation sub model using DES; Second, a synergy benefit evaluation sub model at portfolio level is constructed by considering both the positive and negative benefits brought by SRs allocation using SD; Finally, by clarifying the connection between the two sub models, a hybrid simulation model for SRs allocation is obtained. A case study is used to demonstrate the practicality of the hybrid model. Sensitivity analysis is then conducted to examine how the model output changes due to variations in parameters. The proposed model is also compared with DES model to demonstrate the superiority of the hybridization. Simulation results reveal that the proposed model can systematically integrate the effects of SRs allocation at both project and portfolio levels, which provides PP managers a tool to enhance SRs allocation performance.

18 November 2022 in Journal of Enterprise Information Management
Verified
Journal Article
Closed access
Libiao BaiLibiao Bai
Libiao Bai
LWLan Wei
Lan Wei
YZYipei Zhang
Yipei Zhang
KZKanyin Zheng
Kanyin Zheng
XZXinyu Zhou
Xinyu Zhou
Purpose: Project portfolio risk (PPR) management plays an important role in promoting the smooth implementation of a project portfolio (PP). Accurate PPR prediction helps managers cope with risks timely in complicated PP environments. However, studies on accurate PPR impact degree prediction, which consists of both risk occurrence probabilities and risk impact consequences considering project interactions, are limited. This study aims to model PPR prediction and expand PPR prediction tools.Design/methodology/approach: In this study, the authors build a PPR prediction model based on a genetic algorithm and back-propagation neural network (GA-BPNN) integrated with entropy-trapezoidal fuzzy numbers. Then, the authors verify the proposed model with real data and obtain PPR impact degrees.Findings: The test results indicate that the proposed method achieves an average absolute error of 0.002 and an average prediction accuracy rate of 97.8%. The former is reduced by 0.038, while the latter is improved by 32.1% when compared with the results of the original BPNN model. Finally, the authors conduct an index sensitivity analysis for identifying critical risks to effectively control them.Originality/value: This study develops a hybrid PPR prediction model that integrates a GA-BPNN with entropy-trapezoidal fuzzy numbers. The authors use this model to predict PPR impact degrees, which consist of both risk occurrence probabilities and risk impact consequences considering project interactions. The results provide insights into PPR management.

1 September 2018 in Discrete Mathematics
Verified
Journal Article
Closed access
XWXiumei Wang
Xiumei Wang
YZYipei Zhang
Yipei Zhang
JZJu Zhou
Ju Zhou