Chenyang Hang

Chenyang Hang


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 August 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
HPHong Pan
Hong Pan
CHChenyang Hang
Chenyang Hang
FFFeng Fang
Feng Fang
Yuan ZhengYuan Zheng
Yuan Zheng
FLFang Li
Fang Li
One of the most important characteristic curves in the economic operation of hydropower plants is the turbine flow characteristic curve, which illustrates the law of fluctuation between the characteristic parameters of the turbine under various operating situations. This article proposes an IPSO-LSTM-based refinement method for fitting the turbine flow characteristic curve using deep learning methods, and verifies the effectiveness of the method by comparison to solve the problem that traditional mathematical fitting methods are difficult to meet the requirements of today’s many complex working conditions. Firstly, a deep LSTM network model is established based on the input and output quantities, and then the IPSO method is used to find the optimum number of neurons, the learning rate and the maximum number of iterations of the LSTM units in the network model and other key parameters to determine the relevant training parameters. The results show that the model can effectively improve the accuracy of fitting and predicting the turbine flow characteristics, which is of great significance to the study of the economic operation of hydropower plants and the non-linear characteristics of the turbine.

24 April 2024 in Mathematics
Verified
Journal Article
Open access
PDF file
HPHong Pan
Hong Pan
JYJie Yang
Jie Yang
YYYang Yu
Yang Yu
Yuan ZhengYuan Zheng
Yuan Zheng
XZXiaonan Zheng
Xiaonan Zheng
CHChenyang Hang
Chenyang Hang
The economic operation of hydropower stations has the potential to increase water use efficiency. However, there are some challenges, such as the fixed and unchangeable flow characteristic curve of the hydraulic turbines, and the large number of variables in optimal load distribution, which limit the progress of research. In this paper, we propose a new optimal method of the economic operation of hydropower stations based on improved Long Short-Term Memory neural network (I-LSTM) and Random Forest (RF) algorithm. Firstly, in order to accurately estimate the water consumption, the LSTM model’s hyperparameters are optimized using improved particle swarm optimization, and the I-LSTM method is proposed to fit the flow characteristic curve of the hydraulic turbines. Secondly, the Random Forest machine learning algorithm is introduced to establish a load-distribution model with its powerful feature extraction and learning ability. To improve the accuracy of the load-distribution model, we use the K-means algorithm to cluster the historical data and optimize the parameters of the Random Forest model. A Hydropower Station in China is selected for a case study. It is shown that (1) the I-LSTM method fits the operating characteristics under various working conditions and actual operating characteristics of hydraulic turbines, ensuring that they are closest to the actual operating state; (2) the I-LSTM method is compared with Support Vector Machine (SVM), Extreme Learning Machine (ELM) and Long Short-Term Memory neural network (LSTM). The prediction results of SVM have a large error, but compared with ELM and LSTM, MSE is reduced by about 46% and 38% respectively. MAE is reduced by about 25% and 21%, respectively. RMSE is reduced by about 27% and 24%, respectively; (3) the RF algorithm performs better than the traditional dynamic programming algorithm in load distribution. With the passage of time and the increase in training samples, the prediction accuracy of the Random Forest model has steadily improved, which helps to achieve optimal operation of the units, reducing their average total water consumption by 1.24%. This study provides strong support for the application of intelligent low-consumption optimization strategies in hydropower fields, which can bring higher economic benefits and resource savings to renewable energy production.

24 February 2024 in Mathematics
Verified
Journal Article
Open access
PDF file
HPHong Pan
Hong Pan
ZLZhengliang Luo
Zhengliang Luo
CHChenyang Hang
Chenyang Hang
Yuan ZhengYuan Zheng
Yuan Zheng
FFFang Feng
Fang Feng
XZXiaonan Zheng
Xiaonan Zheng
During the load distribution of hydropower units, the frequent crossing of vibration zones as well as large output fluctuations affect the stability of the power station. A multi-objective double-layer intelligent nesting model that considers the constraint of the output fluctuation of units is proposed to address these problems. The nonlinear constraint unit commitment optimization model layer is built based on outer dynamic programming, and the load distribution optimization model layer is constructed based on the improved biogeography-based optimization algorithm. Simultaneously, the unit output fluctuation constraint is established based on whether the unit combination changes in order to limit the unit output fluctuation. The results of this model indicate that compared with traditional load allocation models, the application of the method proposed in this paper can reduce the fluctuation range of unit output by 85.01%. In addition, except for the inevitable vibration zone crossings during startup and shutdown processes, the unit does not cross the vibration zone during operation, which greatly improves the unit’s vibration isolation and optimization capabilities. The multi-objective double-layer intelligent nested model proposed in this paper has significant advantages in the field of load allocation for hydropower units. It effectively improves the stability and reliability of unit operation, and this method can be applied to practical load allocation processes. It is of great significance for the research on load allocation optimization of hydropower units.