A multi-case load spectrum compiling method is proposed in this study for dynamic modeling of a hydraulic excavator stick to simplify and accelerate the fatigue bench test. This new method includes a simplified criterion of small-load-omitting threshold based on the principle of invariable fatigue damage, an extreme value inference criterion based on the overflow characteristics of the hydraulic system, and a synthetic extrapolation method under various working conditions. Firstly, a one-dimensional spectrum of a medium-sized excavator stick was compiled. Then, the program load spectrum for the bench fatigue test was obtained by modifying the one-dimensional spectrum based on the damage consistency criterion and the damage equivalent principle. Lastly, the fatigue tests were conducted using the program load spectrum, as well as using the random spectrum. The comparison results demonstrate that the damage location and fatigue life distribution of the stick using these two spectra are generally consistent, with a relative error smaller than 8.8%; however, the proposed program load spectrum can accelerate the test process with less time consuming than that of the random spectrum. As a result, the multi-case load spectrum is feasible and reliable for dynamic modeling of the hydraulic excavator stick in practice.
16 February 2022 in International Journal of Pavement Engineering
Current pavement pothole repair technology relies heavily on human experience and manual operation. To automate the repair process of pavement pothole spraying repair, a contour-guided zigzag path planning method based on depth image was proposed in this paper, including pothole slicing and slice repair path planning. In the aspect of pothole slicing, a double flood filling method was proposed to ensure the repair strategy from bottom to up under the priority of region by region, while in the aspect of slice path planning, a contour-guided round-trip repair path planning method was proposed to arrange the repair trajectory homogeneously in the pothole without exceeding its irregular boundary. The path planning results showed that the average spacing error of four kinds of common potholes with different shapes was 7.31%, the average time of the whole path planning process was 1.571 s, the average relative difference of the mean square error was only 1.83 mm, which indicated that the proposed method could obtain high path planning accuracy and fast path planning speed. The results demonstrated that the proposed contour-guided zigzag path planning method based on depth image could be applied to the automatic spraying repair of different potholes with convex or concave contours and achieve good pavement repair flatness.
1 December 2020 in Journal of Mechanical Science and Technology