With the continuous development of engineering construction in China, more and more large-section highway tunnels have emerged. Different geological engineering environments determine the diversity of construction plans. The determination of construction plans and the prediction of tunnel deformations have always been the key points of engineering construction. In this paper, we use numerical simulations to determine specific construction parameters in the context of actual highway tunnel projects, and then use deep learning methods to predict deformation during tunnel construction, thus providing guidance for construction. We have found that: (i) Different excavation sequences and excavation depths have different effects on the surrounding rock deformation around the tunnel. The optimal excavation sequence through numerical simulation in this study is symmetrical excavation, and the excavation depth is 2 m. (ii) Numerical simulation based on Long Short-Term Memory (LSTM) algorithm is used to predict the tunnel deformation. It is found that the prediction results of the LSTM algorithm are more consistent with the actual monitoring data. (iii) Multi-step prediction is more important for engineering guidance, and three-step prediction can be considered during the process of engineering construction. Therefore, the machine learning algorithm provides a new method for engineering prediction.
Shield thrust is a critical operational parameter during shield driving, which is of vital significance for adjusting operational parameters and ensuring efficient and safe propulsion of shield tunneling machine. In this paper, a novel hybrid prediction model (CLM) combining attention mechanism, convolutional neural networks (CNN) and Bi-directional long short-term memory (BiLSTM) network is proposed for shield thrust prediction. Correlation analysis based on Maximal Information Coefficient (MIC) between the thrust and other parameters is first conducted to select optimal parameters and reduce input dimension. An attention mechanism is introduced into CNN to distinguish the importance of different features, with the convolution layer and pooling layer further extracting dimension features of the data. Then, a BiLSTM neural network integrating first attention layer is employed to extract time-varying characteristics of the data, with a second attention layer added to capture important time information. Field data during shield cutting bridge piles are investigated to support and validate the effectiveness and superiority of the proposed method. Results show that the proposed CLM model are general enough to avoid overfitting problems and have good performance at prediction. The predicted value match reasonably well the monitoring data, with coefficient of determination (R 2 ) equaling to 0.85, root mean square error (RMSE) equaling to 0.05, mean absolute error (MAE) equaling to 0.02. The CLM model in this paper can accurately predict the thrust even under complicated construction conditions, which provides reference for similar industrial application.
With the rapid development of tunnel construction, there will be an increasing number of engineering cases about undercrossing existing pipelines. During the undercrossing process, the settlement control of existing pipelines is relatively strict. If the construction is not handled properly, the existing pipelines will cause a larger settlement, which will affect their normal use. This paper takes an existing pipeline project in Nanjing as the research object and uses numerical simulation to explore the influence of different excavation sequences and grouting reinforcement scopes on the existing pipelines above the newly built tunnels when using shallow tunnel excavation. The results show that the sections are constructed first on both sides of the construction, and the middle section is constructed subsequently, which not only increases the excavation speed but also the pipeline deformation is smaller, especially in controlling the differential settlement on both sides of the pipeline. By studying the relationship between the grouting reinforcement range and the vertical distance from the newly built tunnel to the existing pipeline, it is found that the soil engineering effect within 0.3 d above the arch line is more reasonable, and the feasibility of the proposed scheme is verified through actual monitoring data. This research can provide a reference for similar projects in the future.