Wenying Zhang

Dr. Wenying Zhang

Beijing University of Technology, Beijing, China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 May 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Shaole YuShaole Yu
Shaole Yu
YZYujian Zhang
Yujian Zhang
JBJunhao Bie
Junhao Bie
WZWenying Zhang
Wenying Zhang
JJJialei Jiang
Jialei Jiang
XCXinxi Chen
Xinxi Chen
The superimposed slab shear wall has been found to be more and more applicable in the building construction industry due to its building industrialization superiority. The hysteretic behavior of superimposed slab shear walls accounts for an important part of seismic performance analysis. This paper presents the results of a numerical study to investigate the hysteretic behavior of superimposed slab shear walls. Different calculation methods of the shear capacity of the combined interface and horizontal connection are introduced. The calculated results show that the shear capacity of the combined interface and horizontal connection is much larger than the ultimate shear capacity of a superimposed slab shear wall. Therefore, the bond slip effect of a combined interface and horizontal connection can be ignored in finite element analysis on the premise of it not affecting calculation precision. Three different theoretical analysis models, namely the vertical multi-line element model, bend–shear coupled fiber model and layered shell element model, were established in OpenSEES based on a macro-model and a micro-model. The results show that the calculated results of the vertical multi-line element model and the bend–shear coupled fiber model agree reasonably with the experiment results, whereas the calculated results of the layered shell model gave a relatively larger initial stiffness.

14 November 2023 in Buildings
Verified
Journal Article
Open access
PDF file
WZWenying Zhang
Wenying Zhang
YLYuwei Liu
Yuwei Liu
Shaole YuShaole Yu
Shaole Yu
YZYujian Zhang
Yujian Zhang
LYLianping Yang
Lianping Yang
LQLigang Qi
Ligang Qi
The application of BIM technology in building construction provides the possibility to realize design accuracy, to visualize the construction details, to optimize construction schemes, and to enhance cooperation among various professionals. The Yancheng Nanyang Airport terminal 2 project, with its large span of steel roof structure, complex installation in mechanical and electrical pipeline (MEP) engineering, and difficulty in construction organization, is taken as the engineering background. The whole process application of BIM technology in the construction process is introduced. In structural engineering construction, the application of BIM technology can provide guidance for plane layout of the construction site, and can also assist in deepening the designs of irregular steel components. In steel construction, the application of BIM technology gives a commendable visual demonstration of the construction process of the metal roof system and the single-layer reticulated shell. In MEP engineering, the application of BIM technology provides a great approach to establish a synthesis of pipeline drawings to further form pipeline section diagrams and operation drawings. By integrating the dimension of time, precision control, and deviation rectification, a recursive construction drawing can be built. With respect to synergistic management, the quality and safety management in the construction site can be implemented on the basis of BIM terminal equipment as well. This paper will give a great reference on the application of BIM technology in the airport terminal construction.

7 June 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Shaole YuShaole Yu
Shaole Yu
YZYujian Zhang
Yujian Zhang
WZWenying Zhang
Wenying Zhang
LQLigang Qi
Ligang Qi
JYJianxun Yuan
Jianxun Yuan
KZKun Zou
Kun Zou
The Ningbo International Conference Center Project incorporates elements of Chinese traditional culture into its architectural style, resulting in the world’s first cantilever bridge international conference center. During the construction process, it faced challenges such as complex engineering geological environments and diverse architectural styles. By harnessing building information modeling (BIM) technology, many challenges encompassing intricate environmental conditions, architectural structures, and construction complexities are effectively visualized in three dimensions, thereby offering viable solutions for engineering implementation. In the scheme design stage, BIM technology plays a pivotal role in bridging the gap between design and construction, optimizing engineering pile and wall material designs. During the deepening design stage, BIM aids in refining designs through intricate node optimization for the ultralong comb type inclined water panel curtain wall and glued wood column decoration, thereby enhancing construction efficiency. Additionally, BIM technology has also played an important role in the simulation and scheme analysis of the entire construction process of complex steel structures. Through the implementation of BIM technology, numerous challenges encountered during the construction phase of the Ningbo International Conference Center project have been effectively resolved, which serves as a valuable reference for employing BIM technology in large-scale international conference center projects.

29 November 2022 in Buildings
Verified
Journal Article
Open access
PDF file
BJBin Jia
Bin Jia
WZWenying Zhang
Wenying Zhang
TWTi Wu
Ti Wu
YWYuanqing Wang
Yuanqing Wang
Shaole YuShaole Yu
Shaole Yu
This paper investigated the seismic behavior of a prefabricated steel braced frame structure with hinged joints. Six steel frame specimens with different enclosure walls were tested under pseudo-static loading. The results indicated that the vertical load of the hinged braced frame system was mainly resisted by the beam and column members, and the lateral stiffness was completely provided by the bracing members. The final failure mode of all specimens was the failure of the bracings, while the beam-column members and the joints remained largely intact. The rigidly braced specimen was mainly damaged by buckling, yielding, and tearing, and the flexibly braced specimen was mostly damaged by buckling, yielding, and node failure. The energy dissipation of the specimens primarily depended on lateral force-resistant components such as braces and enclosure walls. Different building envelopes exert significant effects on the lateral stiffness and energy dissipation capacity of the structure. The ductility coefficient of all specimens ranged between 1.4 and 1.9, which indicates that the structural system mainly relies on lateral stiffness and elastic deformation to resist earthquakes, rather than structural ductility. The proposed prefabricated steel frame system with hinged connections has wide prospects of application in economically underdeveloped areas because of its convenience in transportation and installation.