View All Publications
1 June 2018 in Thermal Science and Engineering Progress
Verified
Journal Article
Closed access
Alberto BenatoAlberto Benato
Alberto Benato
Anna StoppatoAnna Stoppato
Anna Stoppato


1 October 2017 in Energy
Verified
Journal Article
Closed access
FSFabio Schiro
Fabio Schiro
Alberto BenatoAlberto Benato
Alberto Benato
Anna StoppatoAnna Stoppato
Anna Stoppato
NDNicola Destro
Nicola Destro

13 March 2019 in Energies
Verified
Journal Article
Open access
PDF file
Alberto BenatoAlberto Benato
Alberto Benato
Alarico MacorAlarico Macor
Alarico Macor
Italy is one of the leading nations in the biogas sector. Agricultural, landfill, sewage and manure substrates are converted into biogas using anaerobic digestion and, then, into electricity and heat by means of properly arranged internal combustion engines. In this study, after an overview of the European context, the authors present the Italian biogas sector status in terms of development trends and factors that favour/block biogas spread. Despite the fact that biogas is a renewable fuel and a consolidate technology, it is mandatory to examine its real costs, biogas composition and engine combustion products. For this purpose, in the present work, the authors selected six in-operation biogas plants fed by different substrates, investigate plants construction and operation costs and measure both biogas and engine emissions compositions. Biogas status analysis shows a high growth rate until the end of 2012 due to generous Government subsidies while, after supports reduction, a continuous depletion of biogas installations is observed. Alongside the development, established supports overlook also the plant size as well as the cost. In fact, the most widespread plant nameplate electric power is 1 MW while its construction cost ranges between 4.2–4.8 millions of Euros. Real on-site measurements show variable biogas composition while engine emissions are comparable with the natural gas ones.

1 December 2014 in Applied Energy
Verified
Journal Article
Closed access
LPLeonardo Pierobon
Leonardo Pierobon
Alberto BenatoAlberto Benato
Alberto Benato
ESE. Scolari
E. Scolari
FHFredrik Haglind
Fredrik Haglind
Anna StoppatoAnna Stoppato
Anna Stoppato

1 January 2016 in Applied Energy
Verified
Journal Article
Closed access
Alberto BenatoAlberto Benato
Alberto Benato
Stefano BraccoStefano Bracco
Stefano Bracco
ASA. Stoppato
A. Stoppato
AMA. Mirandola
A. Mirandola