Tobias Schwinn

Dr. Tobias Schwinn

Institute for Computational Design and Construction, University of Stuttgart, 70174 Stuttgart, Germany
orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2014 in Computer-Aided Design
Verified
Journal Article
Closed access
SRSteffen Reichert
Steffen Reichert
Tobias SchwinnTobias Schwinn
Tobias Schwinn
RMRiccardo La Magna
Riccardo La Magna
FWFrédéric Waimer
Frédéric Waimer
JKJan Knippers
Jan Knippers
AMAchim Menges
Achim Menges

22 July 2016
Verified
Book
Closed access
AMAchim Menges
Achim Menges
Tobias SchwinnTobias Schwinn
Tobias Schwinn
OKOliver David Krieg
Oliver David Krieg
In light of environmental challenges architecture is facing, wood is no longer regarded as outmoded, nostalgic, and rooted in the past, but increasingly recognized as one of the most promising building materials for the future. Recent years have seen unprecedented innovation of new technologies for advancing wood architecture. Advancing Wood Architecture offers a comprehensive overview of the new architectural possibilities that are enabled by cutting-edge computational technologies in wood construction. It provides both an overarching architectural understanding and in-depth technological information through built projects and the works of four leading design research groups in Europe. The projects presented include large scale, permanent buildings such as the ETH Arch-Tec Lab Building in Zurich, the Landesgartenschau Exhibition Hall near Stuttgart and the Boiler House in Hooke Park, UK, as well as, built research prototypes investigating additive robotic fabrication, folded plate structures and meteorosensitive building skins. Illustrated in full colour, the book showcases the latest technological developments in design computation, simulation and digital fabrication together with an architectural, engineering and manufacturing perspective, offering an outlook towards novel spatial and constructional opportunities of a material with unrivalled ecological virtues.

1 March 2013 in International Journal of Space Structures
Verified
Journal Article
Closed access
RMRiccardo La Magna
Riccardo La Magna
MGMarkus Gabler
Markus Gabler
SRSteffen Reichert
Steffen Reichert
Tobias SchwinnTobias Schwinn
Tobias Schwinn
FWFrédéric Waimer
Frédéric Waimer
JKJan Knippers
Jan Knippers
In the current paper the authors present a biomimetic design methodology based on the analysis of the Echinoids (sea urchin and sand dollar) and the transfer of its structural morphology into a built full-scale prototype. In the first part, an efficient wood jointing technique for planar sheets of wood through novel robotically fabricated finger-joints is introduced together with an investigation of the biological principles of plate structures and their mechanical features. Subsequently, the identified structural principles are translated and verified with the aid of a Finite Element Model, as well as a generative design system incorporating the rules and constraints of fabrication. The paper concludes with the presentation of a full-scale biomimetic prototype which integrates these morphological and mechanical principles to achieve an efficient and high-performing lightweight structure.

16 October 2016
Verified
Conference Paper
Open access
PDF file
BLBenjamin Lafreniere
Benjamin Lafreniere
TGTovi Grossman
Tovi Grossman
FAFraser Anderson
Fraser Anderson
JMJustin Matejka
Justin Matejka
HKHeather Kerrick
Heather Kerrick
GFGeorge Fitzmaurice
George Fitzmaurice
In recent years, extensive research in the HCI literature has explored interactive techniques for digital fabrication. However, little attention in this body of work has examined how to involve and guide human workers in fabricating larger-scale structures. We propose a novel model of crowdsourced fabrication, in which a large number of workers and volunteers are guided through the process of building a pre-designed structure. The process is facilitated by an intelligent construction space capable of guiding individual workers and coordinating the overall build process. More specifically, we explore the use of smartwatches, indoor location sensing, and instrumented construction materials to provide real-time guidance to workers, coordinated by a foreman engine that manages the overall build process. We report on a three day deployment of our system to construct a 12-tall bamboo pavilion with assistance from more than one hundred volunteer workers, and reflect on observations and feedback collected during the exhibit.

21 March 2014
Verified
Book Chapter
Closed access
PDF file
MPMarshall Prado
Marshall Prado
MDMoritz Dörstelmann
Moritz Dörstelmann
Tobias SchwinnTobias Schwinn
Tobias Schwinn
AMAchim Menges
Achim Menges
JKJan Knippers
Jan Knippers

4 December 2017 in Swarm Intelligence
Verified
Journal Article
Closed access
PDF file
AGAbel Groenewolt
Abel Groenewolt
Tobias SchwinnTobias Schwinn
Tobias Schwinn
LNLong Nguyen
Long Nguyen
AMAchim Menges
Achim Menges