Jinlong Wang

Mr. Jinlong Wang


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 September 2022 in Scientific Reports
Verified
Journal Article
Open access
PDF file
JWJinlong Wang
Jinlong Wang
YSYumin Shen
Yumin Shen
XXXiaoyun Xiong
Xiaoyun Xiong
XWXu Wang
Xu Wang
XFXiaoxue Fang
Xiaoxue Fang
The existing multi-person collaborative design scheme of Building Information Modeling (BIM) integrated with blockchain faces problems such as poor reliability of BIM drawing, inconsistent drawing information, redundant information, and inaccurate protection of copyright interests. This paper proposes a multi-person collaborative design model for BIM drawing that combines blockchain and InterPlanetary File System (IPFS). This model uses blockchain to store drawing design information to protect the copyright interests of designers and combines IPFS to ensure the reliability of drawing. A cycle division mechanism is designed to solve the problem of drawing information synchronization when multiple people collaborate in design. The Semantic Differential Transaction (SDT) method is used to achieve incremental update of drawing and reduce the information redundancy of the blockchain. Finally, a comparative analysis and validation evaluation of the scheme is carried out, and the usability of the scheme is illustrated with an illustrative example. The results show that: (1) proposed scheme is feasible for multi-person collaborative design; (2) proposed scheme can effectively ensure the reliability of drawing and reduce the redundancy of blockchain information, so as to achieve copyright protection for designers.

23 February 2023 in IEEE Transactions on Industrial Informatics
Verified
Journal Article
Closed access
JWJinlong Wang
Jinlong Wang
ZXZhezhuang Xu
Zhezhuang Xu
WWWeixiang Wen
Weixiang Wen
RWRong Wang
Rong Wang
YLYe Lin
Ye Lin
QZQingdong Zhang
Qingdong Zhang
With the development of cloud manufacturing, the automation of storage scheduling becomes popular in the steel industry. However, the high customization of steel plates makes the storage scheduling too complex to be optimized. To overcome this challenge, we propose to utilize the big data of steel plate orders and warehouse status to optimize the storage scheduling of steel plates. The agglomerative hierarchical clustering is first adopted to reduce the complexity of excessive steel plate specifications, then an optimization problem is defined to formulate the storage scheduling of steel plates with safety. A two-stage heuristic (TSH) algorithm is proposed to solve the optimization problem with low complexity. In TSH, steel plates are first assigned to multiple stacks, and then the arrangement of each stack is determined. Experiments are executed based on a cloud manufacturing platform for steel plates production and storage, and the results prove the effectiveness of the proposed works.

25 April 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JWJinlong Wang
Jinlong Wang
ZXZhezhuang Xu
Zhezhuang Xu
MHMingxing He
Mingxing He
LXLiang Xue
Liang Xue
HXHongjie Xu
Hongjie Xu
Pickup vehicle scheduling in steel logistics parks is an important problem for determining the outbound efficiency of steel products. In a steel logistics park, each yard contains different types of steel products, which provides flexible yard selection for each pickup operation. In this case, the yard allocation and the loading sequence for each vehicle must be considered simultaneously in pickup vehicle scheduling, which greatly increases the scheduling complexity. To overcome this challenge, in this paper, we propose a pickup vehicle scheduling problem with mixed steel storage (PVSP-MSS) to optimize the makespan of pickup vehicles and the makespan of steel logistics parks simultaneously. The optimization problem is formulated as a multi-objective mixed-integer linear programming model, and an enhanced algorithm based on SPEA2 (ESPEA) is proposed to solve the problem with a high efficiency. In the ESPEA, a cooperative initialization strategy is firstly proposed to initialize the vehicle pickup sequence for each yard. Then, an insertion decoding method is designed to improve the scheduling efficiency, utilizing the idle time of a yard. Furthermore, local search technology based on critical paths is proposed for the ESPEA to improve the solution quality. Experiments are executed based on data collected from a real steel logistics park. The results confirm that the ESPEA can significantly reduce both the makespan of each pickup vehicle and the makespan of the steel logistics park.

25 November 2021 in International Journal of Antennas and Propagation
Verified
Journal Article
Open access
PDF file
LXLiang Xue
Liang Xue
YMYao Ma
Yao Ma
MZMiao Zhang
Miao Zhang
WQWanqiang Qin
Wanqiang Qin
JWJinlong Wang
Jinlong Wang
YWYazhou Wu
Yazhou Wu
In this paper, the optimal beamforming problem of multi-input single-output (MISO) cognitive radio (CR) downlink networks with simultaneous wireless information and power transfer is studied. Due to the nonconvexity of the objective function, the considered nonconvex optimization problem is firstly transformed to an equivalent subtraction problem and then an approximated convex optimization problem is obtained by using the successive convex approximation (SCA). When the instantaneous channel state information (CSI) of the eavesdropping link is unknown to the legitimate transmitter, another interruption-constrained energy efficiency optimization problem is proposed and the Bernstein-type inequality (BTI) is used to conservatively approximate the probability constraint. The paper proposes a two-level iterative algorithm based on Dinkelbach to find the optimal solution of the EE maximization problem. Numerical results validate the effectiveness and convergence of the proposed algorithm.

17 November 2023
Verified
Conference Paper
Closed access
HXHongjie Xu
Hongjie Xu
JWJinlong Wang
Jinlong Wang
ZXZhezhuang Xu
Zhezhuang Xu
BCBoyu Chen
Boyu Chen
QZQingdong Zhang
Qingdong Zhang
Pickup vehicle scheduling in the steel logistics park is a critical issue in determining the outbound effciency of steel products. Steel products are distributed in the yards of the steel logistics park with mixed storage, and the optional yards for each pickup operation are not unique, which greatly increases the scheduling complexity. To overcome this challenge, in this paper, we propose a pickup vehicle scheduling problem with mixed steel storage (PVSP-MSS) to optimize makespan of pickup vehicle and makespan of steel logistics park simultaneously. The optimization problem is described as a multi-objective problem, and an enhanced Strength Pareto Evolutionary Algorithm 2 (ESPEA) is proposed to solve the problem with high efficiency. Experiments are executed based on data collected from a real steel logistics park. The results confirm that ESPEA can significantly reduce both makespan of each pickup vehicle and makespan of steel logistics park.

28 June 2025 in International Journal of High Speed Electronics and Systems
Verified
Journal Article
Closed access
TCTianbo Chen
Tianbo Chen
RZRuiqing Zhang
Ruiqing Zhang
LXLiang Xue
Liang Xue
YYYazhou Yuan
Yazhou Yuan
JWJinlong Wang
Jinlong Wang
MHMingxing He
Mingxing He