In order to study the present state of the tectonic stress field in northwest Jiaodong Peninsula, the characteristics of the ground stress distribution along depth were analyzed with the method of regression analysis. A total of 164 items of in situ stress measurement data were collected. There are mainly two types of in situ stress states, one is σH>σh>σv and the other is σ>σv>σh, and the type of in situ stress state is related to the depth. The principal stresses σH, σh, and σv increase approximately linearly with depth, and the stress gradients are 0.0556, 0.0248, and 0.0346, respectively. The lateral pressure coefficients KH, Kh, and Kav vary approximately hyperbolically with the increase in depth and approach 1.99, 1.12, and 1.56, respectively. The ratio of half of the maximum horizontal differential stress to the average horizontal principal stress μd varies linearly with the increase of depth and approaches the value of 0.33. The maximum shear stress τm increases approximately linearly with depth, and the stress gradients are 0.0146. The ratio of horizontal principal stress difference with vertical stress on 1000 m–2000 m is 0.5– 0.7. In addition, the maximum level of principal stress advantage direction in the northwest Jiaodong Peninsula is nearly E–W.
Increasing construction depth, changeable failure formations, and redistributed stress conditions inevitably make the mechanical response of mining shaft rock mass complicated. The design method and construction technology of deep shaft need to be perfected urgently. We studied the stability and control method of a main shaft from −930 m located in a deep gold mine. It is concluded that the surrounding rock of the shaft faces conditions including non-high-stressed, high-stressed, and possible instabilities. The failure types include structural plane-controlled failure, deep stress induced failure, rock burst, low confining pressure shear failure, spalling, and frequent conversion of multiple failure. The damages of the surrounding rock mass at −930~−1500 m displayed “ear-shaped” damage, with damage ranges of less than 2.5 m. The shaft temporary reinforcement adopted bolt mResh beam support, in which the length of the bolt was 2.5~3 m, and the row spacing was 1.5 m. The steel type and diameter were determined by the on-site bolt pull test. This temporary support countermeasure plays an important role in preventing shaft deformation and is worth promoting in similar mines.