This study analyzed the effects of the filler–bitumen interaction of the content and the meso powder characteristics of the mineral filler on the low-temperature performance of bitumen mastics. Control strategies for the mineral filler content (filler–bitumen ratio (RFB)) were also determined. Panjin #90 bitumen and styrene–butadiene–styrene polymer-modified bitumen were used in the experiment. Four kinds of limestone powder were used, all of which satisfy the Chinese standard for powder particle size but exhibit different meso characteristics. Each kind of limestone powder was used to prepare bitumen mastic samples under five different RFBs. The meso voids in the unit mass (Vg) of the four kinds of mineral filler were tested on the basis of the principle of the Rigden void ratio. The fixed bitumen–free bitumen ratio in the bitumen mastic samples was determined using Vg, bitumen density, and RFB. The low-temperature cohesive strength of the bitumen mastics was used as the control index for critical failure, whereas variation rates of bending creep stiffness at low temperature were used as the control index for fatigue failure. Results showed that the effects of the filler–bitumen interaction of the content and the meso characteristics of the mineral filler are significant and such effects are determined by the fixed bitumen–free bitumen ratio. The optimal fixed bitumen–free bitumen ratio in the bitumen mastics under two low-temperature conditions (−30 °C and −10 °C) can be determined on the basis of the influence of the fixed bitumen–free bitumen ratio on the critical and the failure control indices. Moreover, RFB can be obtained through reverse calculation. The mineral filler content can therefore be precisely controlled, which is crucial for the rational use of mineral filler and for the improvement of the pavement performance of bitumen mastics at low temperatures.
This study mainly uses PFC (particle follow code) to simulate the void characteristics of permeable asphalt mixture, and uses these to simulate the silting process. Then, a tire drop test was used to evaluate the noise reduction performance of permeable asphalt concrete. Finally, a self-made ring rutting test machine was used to simulate the silting process. Through experiments, the following conclusions were obtained: 1. The critical size of the sludge particle size is 0.3 mm–0.6 mm. 2. The quality of the water-permeable asphalt concrete specimens increased by 13% before and after silting, and the porosity of the specimens finally decreased from about 20% to about 8%. The water-permeable function only retained less than 20% of the original, and the water-permeable function was basically lost. 3. By measuring the road noise detection, it was found that the road noise is directly proportional to the degree of blockage of the permeable road. Compared with the original road with a perfect permeable function, the road noise of the completely blocked road increased by about 4 decibels. This study reveals the silting process of permeable asphalt mixture and the key particle size of the silt, which is of great significance for the detection, cleaning and maintenance of permeable asphalt pavements.