The deformation control of roadways surrounded by rock in the fully mechanized amplification sections of extra-thick coal seams is problematic. To analyze the failure and failure characteristics of a support frame, as well as the deformation and failure processes of the surrounding rock, through theoretical analysis and industrial tests, the deformation and support conditions of a return airway of a fully mechanized caving face in an extra-thick coal seam in the Yangchangwan Coal Mine, in the Ningdong mining, area were examined. Combined with limit equilibrium theory and roadway section size, the width of the coal pillar of the return air roadway at the 130,205 working face was calculated to be 6 m. The layout scheme and implementation parameters of roof blasting pressure relief, coal pillar grouting modification, and bolt (cable) support were designed. Based on the analysis, a “Coal pillar optimization–roof cutting destressing–routing modification–rock bolting” system for surrounding rock control in synergy with the fully enlarged section mining roadway in the extra-thick coal seam was proposed, and the deformation of the surrounding rock was monitored, along with the stress of the support body and the grouting effect on the site. Field experiments show that after the implementation of the surrounding rock control in synergy with the roadway, the maximum subsidence of the top plate was 55 mm, the maximum bottom heave of the bottom plate was 55 mm, the maximum values of the upper and lower side drums were 30 mm and 70 mm, respectively, and the breaking rate of the bolt (cable) and the deformation of the surrounding rock of the roadway was reduced by more than 90% and 70%, respectively. The effective performance of the coal pillar grouting was observed as well. Field practice of the roadway surrounding rock control in the synergy method indicated that rock deformation was effectively controlled, and the successful application of this technology was able to provide reliable technical and theoretical support for the Ningdong mining area and mines with similar conditions.
Borehole pressure relief technology is an effective way to reduce the elastic energy in the surrounding rock of deep roadways, thereby reducing the risk of regional rock bursts. To avoid large deformation of the roadway caused by pressure relief holes with large diameters and insufficient pressure relief with small pore diameters, this study proposes precise pressure relief holes with nonequal diameters in order to achieve strong pressure relief with minimal disturbance based on the abutment pressure distribution pattern. To verify the pressure relief effect of the nonequal diameter holes, numerical simulations were performed in FLAC3D. This study investigated stress field, deformation laws, and plastic failure zone of roadway surrounding rock with 100 mm pressure relief holes, nonequal diameter precision pressure relief hole (100 mm + 300 mm), and 300 mm pressure relief holes. The simulation results show that, as the diameter of the pressure relief hole increases, the coupling effect of evenly spaced adjacent pressure relief holes is strengthened, thus improving the pressure relief efficiency. When pressure relief holes of nonequal diameter are adopted, the stress environment of the surrounding rock is clearly improved compared to100 mm pressure relief holes, and the plastic failure range increased by 2‐3 times. The roof‐to‐floor convergence with nonequal diameter is 30.8% that of 300 mm pressure relief holes and 41% that of 100 mm pressure relief holes. Furthermore, the rib displacement is 30.4% and 46.9% that of 300 mm and 100 mm pressure relief holes, respectively. Thus, precise pressure relief holes with nonequal diameter provide both strong pressure relief associated with large diameter holes and small disturbance of small diameter of small holes. This study provides a reference for precise pressure relief application with pressure relief holes.
Strip coal pillars caused by strip mining are widely distributed in China. Over time, strip coal pillars are posing more potential hazards as their stability decreases; therefore, it becomes increasingly important to recover coal pillars without damaging the ground surface. In this paper, strip-filling and second-mining technique is adopted to probe into an optimal scheme for mine goafs. Construction waste was one type of the materials used for backfilling, which was taken to underground from the surface with a pumping system. Jisuo Coal Mine of Tengzhou, Shandong province was taken as the object of study. Through theoretical calculation and on-site survey, we set a re-mining scheme to control rock stratum stability, i.e., 8-m-wide backfilling for the first time and 4-m-wide backfilling for the second time; moreover, the ground pressure behavior and subsidence of working surface were monitored and a contour map of surface subsidence was thus mapped. In-situ practice indicated that the underground pressure from coal pillars was transmitted to the backfilling materials, the maximum normal stress of which was 5 MPa, so it was sufficient for the backfilling strip to support the weight of overlying strata; the maximum value of roof-to-floor convergence of backfilled mining face is 45 mm, the maximum surface subsidence 44mm, the maximum inclination value 0.65 mm/m, the maximum surface curvature 0.018 mm/m2, and the maximum horizontal deformation 0.16 mm/m. The filling body in the original goafs plays the role of “pier”. By the monitoring data of subsidence, its surface deformation value was less than that of buildings suffering from grade I damage, which verified the feasibility of strip-filling and second-mining scheme. The success in this technique provides reliable technical and theoretical support for mines with similar conditions.