In this paper, an improved probabilistic roadmap (IPRM) algorithm is proposed to solve the energy consumption problem of multi-unmanned aerial vehicle (UAV) path planning with an angle. Firstly, in order to simulate the real terrain environment, a mathematical model was established; secondly, an energy consumption model was established; then, the sampling space of the probabilistic roadmap (PRM) algorithm was optimized to make the obtained path more explicit and improve the utilization rate in space and time; then, the sampling third-order B-spline curve method was used to curve the rotation angle to make the path smoother and the distance shorter. Finally, the results of the improved genetic algorithm (IGA), PRM algorithm and IPRM algorithm were compared through a simulation. The data analysis shows that the IGA has significant advantages over other algorithms in some aspects, and can be well applied to the path planning of UAVs.
In real-world production processes, the same enterprise often has multiple factories or one factory has multiple production lines, and multiple objectives need to be considered in the production process. A dual-population genetic algorithm with Q-learning is proposed to minimize the maximum completion time and the number of tardy jobs for distributed hybrid flow shop scheduling problems, which have some symmetries in machines. Multiple crossover and mutation operators are proposed, and only one search strategy combination, including one crossover operator and one mutation operator, is selected in each iteration. A population assessment method is provided to evaluate the evolutionary state of the population at the initial state and after each iteration. Two populations adopt different search strategies, in which the best search strategy is selected for the first population and the search strategy of the second population is selected under the guidance of Q-learning. Experimental results show that the dual-population genetic algorithm with Q-learning is competitive for solving multi-objective distributed hybrid flow shop scheduling problems.
Distributed scheduling is seldom investigated in hybrid flow shops. In this study, distributed two-stage hybrid flow shop scheduling problem (DTHFSP) with sequence-dependent setup times is considered. A collaborative variable neighborhood search (CVNS) is proposed to simultaneously minimize total tardiness and makespan. DTHFSP is simplified by incorporating factory assignment into machine assignment of a prefixed stage, and its solution is newly represented with a machine assignment string and a scheduling string. CVNS consists of two cooperated variable neighborhood search (VNS) algorithms, and neighborhood structures and global search have collaborated in each VNS. Eight neighborhood structures and two global search operators are defined to produce new solutions. The current solution is periodically replaced with a member of the archive farthest from it. Experiments are conducted , and the computational results validate that CVNS has good advantages over the considered DTHFSP.
1 January 2023 in Mathematical Biosciences and Engineering
The job shop scheduling problem (JSP) has consistently garnered significant attention. This paper introduces an improved genetic algorithm (IGA) with dynamic neighborhood search to tackle job shop scheduling problems with the objective of minimization the makespan. An inserted operation based on idle time is introduced during the decoding phase. An improved POX crossover operator is presented. A novel mutation operation is designed for searching neighborhood solutions. A new genetic recombination strategy based on a dynamic gene bank is provided. The elite retention strategy is presented. Several benchmarks are used to evaluate the algorithm's performance, and the computational results demonstrate that IGA delivers promising and competitive outcomes for the considered JSP.