Long Chen

Dr. Long Chen

School of Architecture, Building and Civil Engineering, Loughborough University, Loughborough, UK
orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2020 in Automation in Construction
Verified
Journal Article
Closed access
QLQiuchen Lu
Qiuchen Lu
Long ChenLong Chen
Long Chen
SLShuai Li
Shuai Li
MPMichael Pitt
Michael Pitt

26 July 2022 in Construction and Building Materials
Verified
Journal Article
Closed access
CZCheng Zhang
Cheng Zhang
Yang ZouYang Zou
Yang Zou
FWFeng Wang
Feng Wang
ECEnrique del Rey Castillo
Enrique del Rey Castillo
JDJohannes Dimyadi
Johannes Dimyadi
Long ChenLong Chen
Long Chen

1 January 2018 in Automation in Construction
Verified
Journal Article
Closed access
QLQiuchen Lu
Qiuchen Lu
Long ChenLong Chen
Long Chen
SLSanghoon Lee
Sanghoon Lee
XZXiaojing Zhao
Xiaojing Zhao

1 March 2021 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
Long ChenLong Chen
Long Chen
Qiuchen LuQiuchen Lu
Qiuchen Lu
SLShuai Li
Shuai Li
WHWenjing He
Wenjing He
JYJian Yang
Jian Yang
As the construction of infrastructures becomes increasingly complex, it has often been challenged by construction delay with enormous losses. The delivery of complex infrastructures provides a rich source of data for new opportunities to understand and address schedule issues. Based on these data, many efforts have been made to identify key construction schedule risks and predict the probability of risk occurrence. Bayesian network is one of the most useful tools for risk inference. However, there are still two obstacles preventing the Bayesian network from being adopted popularly in construction schedule risk management: (1) the development of directed acyclic graph (DAG) and associated conditional probability tables (CPTs); and (2) the lack of observation data to trigger risk inference as evidence at the planning stage. This research aims to develop a novel Bayesian Monte Carlo simulation–driven approach for construction schedule risk inference of infrastructures, where the Bayesian network model can be developed in a more convenient way and be used without observation data required. It first constructs the key risk network with key risks and links through network theory–based analysis. Then the DAG structure of a Bayesian network is developed based on the topological structure of key risk network using deep-first search (DFS) and adapted maximum-weight spanning tree (A-MWST) algorithms. The CPTs are further developed using the leaky-MAX model. Finally, the Bayesian Monte Carlo simulation–driven risk inference method is developed for predicting and quantifying the probability of construction schedule risk occurrence. A real infrastructure project was selected as a case study to verify this developed approach. The results show that the developed approach is more appropriate to deal with risk inference of infrastructures considering its reliability, convenience, and flexibility. This research contributes a new way to construction schedule risk management and provides a novel approach for quantifying and predicting risk occurrence probability.

1 August 2018 in Automation in Construction
Verified
Journal Article
Closed access
QLQiuchen Lu
Qiuchen Lu
SLSanghoon Lee
Sanghoon Lee
Long ChenLong Chen
Long Chen

23 July 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Long ChenLong Chen
Long Chen
Xiang XieXiang Xie
Xiang Xie
Qiuchen LuQiuchen Lu
Qiuchen Lu
Ajith Kumar ParlikadAjith Kumar Parlikad
Ajith Kumar Parlikad
MPMichael Pitt
Michael Pitt
JYJian Yang
Jian Yang
Various maturity models have been developed for understanding the diffusion and implementation of new technologies/approaches. However, we find that existing maturity models fail to understand the implementation of emerging digital twin technique comprehensively and quantitatively. This research aims to develop an innovative maturity model for measuring digital twin maturity for asset management. This model is established based on Gemini Principles to form a systematic view of digital twin development and implementation. Within this maturity model, three main dimensions consisting of nine sub-dimensions have been defined firstly, which were further articulated by 27 rubrics. Then, a questionnaire survey with 40 experts involved is designed and conducted to examine these rubrics. This model is finally illustrated and validated by two case studies in Shanghai and Cambridge. The results show that the digital twin maturity model is effective to qualitatively evaluate and compare the maturity of digital twin implementation at the project level. It can also initiate the roadmap for improving the performance of digital twin supported asset management.