Jinyu Dong

Dr. Jinyu Dong


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2022 in Scientific Reports
Verified
Journal Article
Open access
PDF file
XZxingsheng zhang
xingsheng zhang
SYShaobin Yan
Shaobin Yan
HTHaicheng Tan
Haicheng Tan
JDJinyu Dong
Jinyu Dong
Coal mining may lead to ground subsidence in a long term and is widely distributed, which can cause environmental damage and other disasters. Predicting the dynamic process of ground subsidence in real time is very important for offering theoretical or technical guidance to deal with the consequences of mining. In this study, we developed a prediction method for dynamic ground subsidence using a time function model that considers two stages of surface subsidence and reflects the law of surface subsidence in goaf. We applied the model to the Barapukuria mine, and our simulation shows that the prediction results are in good agreement with the monitoring data. Our results suggest that the dynamic development of the ground subsidence basin may be an effective measure to assess the loss of ground and provide early warning of oncoming hazards.

22 February 2024 in Environmental Science and Pollution Research
Verified
Journal Article
Closed access
PDF file
XZxingsheng zhang
xingsheng zhang
CWChaoyue Wang
Chaoyue Wang
XCXing Chen
Xing Chen
JDJinyu Dong
Jinyu Dong
MHMengke Hu
Mengke Hu
SLShipeng Liu
Shipeng Liu

8 May 2023 in Water
Verified
Journal Article
Open access
PDF file
XZxingsheng zhang
xingsheng zhang
MHmengke Hu
mengke Hu
XCXing Chen
Xing Chen
JDJinyu Dong
Jinyu Dong
SLShipeng Liu
Shipeng Liu
The waterproof curtain plays an important role in the dewatering of a deep foundation pit. Recognition of the depth of the waterproof curtain inserted into the confined aquifer at different depths may help control ground subsidence due to dewatering, but subsidence analysis of the interaction between dewatering and the waterproof curtain requires further study. In this study, we mainly analyze the relationship between ground subsidence and dewatering based on the shield shaft pit of the Qianhai-Nanshan deep tunnel project in Shenzhen. Our numerical simulation results show that the ground subsidence around the foundation pit decreases with an increase in the depth of the waterproof curtain inserted into the confined aquifer, and when the waterproof curtain completely penetrates the confined aquifer, the ground subsidence caused by pit dewatering is minimal. Our numerical simulation results are consistent with the actual on-site dewatering monitoring data. Our results suggest that the diaphragm wall is an effective measure to control the ground subsidence in deep foundations, helping to reduce excessive dewatering.

4 September 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
XZxingsheng zhang
xingsheng zhang
THTan Haicheng
Tan Haicheng
ZLZihui Liu
Zihui Liu
JDJinyu Dong
Jinyu Dong
SLShipeng Liu
Shipeng Liu
A dense network of underground tunnels usually makes subsequent tunnels cross existing tunnels in the process of urbanization. In this study, we mainly study the deformation of the subway line 11 caused by the under-crossing of the Qianhai–Nanshan Integrated Drainage Deep Tunnel in Shenzhen. We analyzed the process of displacement during the subsequent tunnel under-crossing the subway line 11 according to the displacement monitoring data. Our results demonstrate that deformation detection is an effective measure for controlling the impact of the subsequent tunnel under-crossing subway tunnels. The aim of this paper may provide guidelines for some existing tunnels that are under-crossed by subsequent tunnels with similar conditions.

15 April 2019 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
TJTong Jiang
Tong Jiang
XPXuwei Pan
Xuwei Pan
MRMiao Ren
Miao Ren
MRMinghao Ren
Minghao Ren
JLJiahua Lei
Jiahua Lei
JDJinyu Dong
Jinyu Dong

7 January 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
YCYapeng Chen
Yapeng Chen
TWTong Wu
Tong Wu
XYXiaoshi Yan
Xiaoshi Yan
SSShang Shi
Shang Shi
JLJianyong Li
Jianyong Li
JDJinyu Dong
Jinyu Dong
Based on a typical project in an altered rock area, this study carried out numerical simulations using the FLAC3D software to calculate the changes in the stress field, deformation field, and plastic zone of the surrounding rock during the unsupported and supported excavation of a water transfer tunnel. The degree of alteration of the surrounding rock was considered as the base point. The following results were obtained: in the unsupported state, the tunnel surrounding rock was affected by different degrees of alteration, and compressive stress concentration appeared within a certain range at the bottom of the chamber. The value of all-directional stress decreased with the deepening of the degree of alteration, while the opposite was the case for the depth of influence. The displacement changes at the bottom and side walls of the chamber were large and increased significantly with the deepening of the degree of alteration; the displacement monitoring points distributed around the tunnel exhibited the same deformation trend. The plastic zone of the surrounding rock obviously expanded as the degree of alteration deepened. The stress, deformation field, and plastic zone of the tunnel surrounding rock were effectively controlled after the adoption of support measures. The results obtained by this study can be used as a reference for similar projects in altered rock areas.