Burhanettin Durmuş

Dr. Burhanettin Durmuş


Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2012 in Energy
Verified
Journal Article
Closed access
SÖSerdar Özyön
Serdar Özyön
HTHasan Temurtaş
Hasan Temurtaş
BDBurhanettin Durmuş
Burhanettin Durmuş
GKGültekin Kuvat
Gültekin Kuvat

7 August 2021 in Neural Computing and Applications
Verified
Journal Article
Closed access
PDF file
BDBurhanettin Durmuş
Burhanettin Durmuş

1 January 2015 in Turkish Journal of Electrical Engineering and Computer Sciences
Verified
Journal Article
Closed access
SÖSerdar Özyön
Serdar Özyön
CYCelal Yaşar
Celal Yaşar
BDBurhanettin Durmuş
Burhanettin Durmuş
HTHasan Temurtaş
Hasan Temurtaş

16 January 2009 in Journal of Intelligent Manufacturing
Verified
Journal Article
Closed access
PDF file
BDBurhanettin Durmuş
Burhanettin Durmuş
HTHasan Temurtaş
Hasan Temurtaş
Nejat YumusakNejat Yumusak
Nejat Yumusak
FTFevzullah Temurtaş
Fevzullah Temurtaş

23 April 2020 in Neural Computing and Applications
Verified
Journal Article
Closed access
PDF file
BDBurhanettin Durmuş
Burhanettin Durmuş
HTHasan Temurtaş
Hasan Temurtaş
SÖSerdar Özyön
Serdar Özyön

1 July 2012
Verified
Conference Paper
Closed access
SOSerdar Ozyon
Serdar Ozyon
CYCelal Yaşar
Celal Yaşar
BDBurhanettin Durmuş
Burhanettin Durmuş
DADogan Aydin
Dogan Aydin
The efficient and the economical operation of the power generation units constitutes one of the most important parts of energy engineering. Most of the studies done on this subject have focused on the meeting of the demanded power by the generated power and the minimization of the generation cost of the system. These kinds of problems are the optimization problems in which the total fuel cost is minimized under the system constraints. In this study, economic power dispatch problem with prohibited operating zone which additionally considers ramp-rate limits of the generators as well as the present constraints has been solved by artificial bee colony algorithm (ABC). The transmission line losses used in the solution of the problem have been computed by B-loss matrix. ABC method has been applied to the 15 generator test system in literature. The attained optimum solution values have been compared with the optimum results in literature and the results have been discussed.