Peiyuan Pan

Dr. Peiyuan Pan


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 January 2024 in Energies
Verified
Journal Article
Open access
PDF file
FGFangxu Gui
Fangxu Gui
HCHeng Chen
Heng Chen
XZXinyue Zhao
Xinyue Zhao
PPPeiyuan Pan
Peiyuan Pan
CXCheng Xin
Cheng Xin
XJXue Jiang
Xue Jiang
The transformer is a fundamental piece of equipment for power grids. The analysis and optimization of their life-cycle costs are of great importance to reinforce the economic efficiency of electrical networks. This paper constructs a comprehensive transformer life-cycle cost (LCC) model by fusing life-cycle cost theory with relevant transformer expenditure. It proceeds to examine the life-cycle cost aspects of the transformer, delving into its cost dynamics under various influencing factors, establishing interconnections between these factors and analyzing the cost relationship. By employing MATLAB software (Matlab 2021a) along with the whale optimization algorithm (WOA) this paper optimizes the objective function. Through this, it establishes the LCC model for 20 power transformers, obtaining the optimal objective function curve and the maximum value for LCC optimization of the transformer. Unlike previous research, this study adds a detailed analysis of several factors that influence LCC. At the same time, it develops a more complete, scientific and rational LCC optimization model. An illustrative example validates the model and the superiority of the whale optimization algorithm. The algorithm not only shows its scientific basis and superiority, but also serves as a guiding mechanism for LCC management in transformer engineering practices. Ultimately, it emerges as a fundamental tool to improve the efficiency of power grid asset management.

31 January 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XZXinyue Zhao
Xinyue Zhao
FGFangxu Gui
Fangxu Gui
HCHeng Chen
Heng Chen
LFLanxin Fan
Lanxin Fan
PPPeiyuan Pan
Peiyuan Pan
Transformers, as the hub equipment of the power system, are highly valued by engineering and scientific researchers in production practice and scientific research. The goal of transformer research is to ensure the safe operation of transformers while considering their economic benefits, arrange transformer inspections reasonably to reduce inspection costs, and save labor and maintenance costs reasonably. This study first provides a brief analysis of the life cycle cost of transformers. The life cycle of transformers is divided into initial cost, operating cost, maintenance cost, fault cost, and scrap cost. Based on the distribution of transformer failure rate, the corresponding life cycle cost of transformers is calculated. Taking 110 kV transformers as an example, the differences in the impact of key factors on the full life cycle cost are analyzed to achieve high quality, high reliability, economically optimal equipment procurement.

10 December 2020 in ACS Omega
Verified
Journal Article
Open access
PPPeiyuan Pan
Peiyuan Pan
WZWeijian Zhou
Weijian Zhou
HCHeng Chen
Heng Chen
NZNaiqiang Zhang
Naiqiang Zhang
Sulfuric acid condensation has long been considered as the major cause of the corrosion issues at the cold-end of coal-fired boilers. However, in a flue gas cooler, where flue gas is cooled to around 90 °C for heat recovery, the influence of chlorides might be underestimated. In this article, some elbows of the heat transfer tubes in the flue gas cooler of a coal-fired power plant were found to be badly corroded, after a 5-year operation. The corroded elbows, coupled with the corrosion products and deposits on the tube wall, were sampled and analyzed by scanning electron microscopy, energy dispersive spectrometry, X-ray diffraction, X-ray fluorescence spectroscopy, and ion chromatography. The results indicated that chlorides, unexpectedly, formed in flue gas before the dew point for hydrochloric acid was met. The corrosion layer on the steel surface was mainly composed of Fe2O3, Fe3O4, and FeO(OH), while showing an oxidation gradient in depth. The sulfates in the corrosion products were rather limited. Instead, Cl– from the deposits gradually accumulated deep inside the corrosion layer, resulting in a considerable generation of Cl-containing compounds. The enrichment of Cl induced cracking and spalling of the corrosion products, and greatly accelerated the failure of the tube wall.

31 March 2023 in Entropy
Verified
Journal Article
Open access
PDF file
YDYuehong Dong
Yuehong Dong
LWLai Wei
Lai Wei
SWSheng Wang
Sheng Wang
PPPeiyuan Pan
Peiyuan Pan
HCHeng Chen
Heng Chen
A hybrid scheme integrating the current waste heat recovery system (WHRS) for a silicon arc furnace with plasma gasification for medical waste is proposed. Combustible syngas converted from medical waste is used to drive the gas turbine for power generation, and waste heat is recovered from the raw syngas and exhaust gas from the gas turbine for auxiliary heating of steam and feed water in the WHRS. Meanwhile, the plasma gasifier can also achieve a harmless disposal of the hazardous fine silica particles generated in polysilicon production. The performance of the proposed design is investigated by energy, exergy, and economic analysis. The results indicate that after the integration, medical waste gave rise to 4.17 MW net power at an efficiency of up to 33.99%. Meanwhile, 4320 t of the silica powder can be disposed conveniently by the plasma gasifier every year, as well as 23,040 t of medical waste. The proposed design of upgrading the current WHRS to the hybrid system requires an initial investment of 18,843.65 K$ and has a short dynamic payback period of 3.94 years. Therefore, the hybrid scheme is feasible and promising for commercial application.

23 April 2021 in Energy & Fuels
Verified
Journal Article
Closed access
PPPeiyuan Pan
Peiyuan Pan
KPKamila Piotrowska
Kamila Piotrowska
MMMelanie Montgomery
Melanie Montgomery
RARajan Ambat
Rajan Ambat
MJMorten Stendahl Jellesen
Morten Stendahl Jellesen
HCHeng Chen
Heng Chen

21 August 2024 in Electronics
Verified
Journal Article
Open access
PDF file
QZQiwei Zheng
Qiwei Zheng
HCHeng Chen
Heng Chen
KGKaijie Gou
Kaijie Gou
PPPeiyuan Pan
Peiyuan Pan
GXGang Xu
Gang Xu
GZGuoqiang Zhang
Guoqiang Zhang
Aiming at the problems of small thermal power units and biomass mixed combustion units with small generation loads and insufficient primary frequency modulation capability, which cannot be connected to the virtual power plant, this paper adopts a variety of flexibility retrofit methods for the units and explores the peak load capability of the units. Then, multiple units are coupled, and the unit coupling scheme with better economy and environmental protection is screened using comprehensive evaluation indexes. While evaluating the peaking load space of multiple unit coupling, the units’ primary frequency regulation capability and new energy consumption capability are improved. According to the calculation results, the low-pressure cylinder zero-output retrofit has the largest peaking potential among different technical paths, in which unit #3 has 27.55 MW of peaking space. The compression heat pump decoupling retrofit has the best economy, in which the daily profit of unit #3 increases from 0.93 to 1.02 million CNY with an increase of 0.09 million CNY. After the unit has been retrofitted with steam extraction, the three units can be coupled to meet the national feed-in standards. The multiple unit coupling can accommodate up to 203.44 MW of other energy sources while meeting the standard.