Shichuan Zhang

Dr. Shichuan Zhang

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 April 2018 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
YLYangyang Li
Yangyang Li
SZShichuan Zhang
Shichuan Zhang
XZXin Zhang
Xin Zhang

27 February 2017 in Mine Water and the Environment
Verified
Journal Article
Closed access
PDF file
SZShichuan Zhang
Shichuan Zhang
WGWeijia Guo
Weijia Guo
YLYangyang Li
Yangyang Li
WSWenbin Sun
Wenbin Sun
DYDawei Yin
Dawei Yin

22 November 2017 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
SZShichuan Zhang
Shichuan Zhang
QYQingguo Yao
Qingguo Yao
YLYangyag Li
Yangyag Li

31 December 2019 in Geofluids
Verified
Journal Article
Open access
PDF file
SZShichuan Zhang
Shichuan Zhang
Baotang ShenBaotang Shen
Baotang Shen
YLYangyang Li
Yangyang Li
SZShengfan Zhou
Shengfan Zhou
Water inrush in underground mines is a major safety threat for mining personnel, and it can also cause major damage to mining equipment and result in severe production losses. Water inrush can be attributed to the coalescence of rock fractures and the formation of water channel in rock mass due to the interaction of fractures, hydraulic flow, and stress field. Hence, predicting the fracturing process is the key for investigating the water inrush mechanisms for safe mining. A new coupling method is designed in FRACOD to investigate the mechanisms of water inrush disaster (known as “Luotuoshan accident”) which occurred in China in 2010 in which 32 people died. In order to investigate the evolution processes and mechanisms of water inrush accident in Luotuoshan coal mine, this study applies the recently developed fracture-hydraulic (F-H) flow coupling function to FRACOD and focuses on the rock fracturing processes in a karst collapse column which is a geologically altered zone linking several rock strata vertically formed by the long-term dissolution of the flowing groundwater. The numerical simulation of water inrush is conducted based on the actual geological conditions of Luotuoshan mining area, and various materials with actual geological characteristics were used to simulate the rocks surrounding the coal seam. The influences of several key factors, such as in situ stresses, fractures on the formation, and development of water inrush channels, are investigated. The results indicate that the water inrush source is the Ordovician limestone aquifer, which is connected by the karst collapse column to No. 16 coal seam; the fracturing zone that led to a water inrush occurs in front of the roadway excavation face where new fractures coalesced with the main fractured zone in the karst collapse column.

16 September 2020 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
BCBing Chen
Bing Chen
SZShichuan Zhang
Shichuan Zhang
YLYangyang Li
Yangyang Li
ZLZongkai Li
Zongkai Li
HZHaijun Zhou
Haijun Zhou

13 March 2017 in Mine Water and the Environment
Verified
Journal Article
Closed access
PDF file
WSWenbin Sun
Wenbin Sun
SZShichuan Zhang
Shichuan Zhang
WGWeijia Guo
Weijia Guo
WLWeitao Liu
Weitao Liu