Jolanta Świȩchowicz

Dr. Jolanta Świȩchowicz


Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 August 2023 in Scientific Data
Verified
Journal Article
Open access
PDF file
FMFrancis Matthews
Francis Matthews
GVGert Verstraeten
Gert Verstraeten
PBPasquale Borrelli
Pasquale Borrelli
MVMatthias Vanmaercke
Matthias Vanmaercke
Jean PoesenJean Poesen
Jean Poesen
PPPanos Panagos
Panos Panagos
As a network of researchers we release an open-access database (EUSEDcollab) of water discharge and suspended sediment yield time series records collected in small to medium sized catchments in Europe. EUSEDcollab is compiled to overcome the scarcity of open-access data at relevant spatial scales for studies on runoff, soil loss by water erosion and sediment delivery. Multi-source measurement data from numerous researchers and institutions were harmonised into a common time series and metadata structure. Data reuse is facilitated through accompanying metadata descriptors providing background technical information for each monitoring station setup. Across ten European countries, EUSEDcollab covers over 1600 catchment years of data from 245 catchments at event (11 catchments), daily (22 catchments) and monthly (212 catchments) temporal resolution, and is unique in its focus on small to medium catchment drainage areas (median = 43 km2, min = 0.04 km2, max = 817 km2) with applicability for soil erosion research. We release this database with the aim of uniting people, knowledge and data through the European Union Soil Observatory (EUSO).


16 December 2002 in Earth Surface Processes and Landforms
Verified
Journal Article
Closed access
PDF file
JŚJolanta Świȩchowicz
Jolanta Świȩchowicz

11 November 2011
Verified
Book Chapter
Closed access
PDF file
Zofia RączkowskaZofia Rączkowska
Zofia Rączkowska
Adam ŁajczakAdam Łajczak
Adam Łajczak
WMWłodzimierz Margielewski
Włodzimierz Margielewski
JŚJolanta Świȩchowicz
Jolanta Świȩchowicz

1 November 2012 in Zeitschrift für Geomorphologie
Verified
Journal Article
Closed access
JŚJolanta Świȩchowicz
Jolanta Świȩchowicz

19 February 2025 in Land Degradation & Development
Verified
Journal Article
Open access
JPJoanna Piasecka-Rodak
Joanna Piasecka-Rodak
JŚJolanta Świȩchowicz
Jolanta Świȩchowicz
ANAlicja Najwer
Alicja Najwer
ZZZbigniew Zwoliński
Zbigniew Zwoliński
Human impact in the form of reservoir construction and river regulation downstream of reservoirs, is causing irreversible alterations to hillslope and river channel connectivity in river catchments. This disruption in the dynamic equilibrium of the river is attributed to sediment accumulation upstream of the reservoir's dam, limited sediment outflow from the reservoir, and increased downcutting downstream of the dam. Consequently, these alterations necessitate further human interference in natural environmental processes through the construction of various river engineering structures designed to reduce the intensity of downcutting. The purpose of the present study was to assess the impact of a small mountain reservoir and additional river regulation structures on the Wapienica River in southern Poland, focusing on the structural and functional connectivity of the river channel in terms of sediment transfer. This assessment was based on erosion and connectivity modeling, as well as field mapping. A high‐resolution digital elevation model (HRDEM) was examined in the study along with survey data on suspended sediment accumulation sites along the river. The study utilized open‐source tools, including SedInConnect for connectivity index (IC) calculation, and the Soil and Water Assessment Tool (SWAT) for ArcGIS software. It was found that the Wapienica reservoir permanently retains the floating material, making the likelihood of this material flowing out of the reservoir minimal. Within the reverse delta of the reservoir, the entire load of bottom material (sand) is also retained. Thicker bottom material (gravel, boulders) is deposited in the riverbed within the delta, leading to the shallowing of the bed upstream of the delta. These processes disrupt longitudinal connectivity. Six connectivity zones have been identified within the catchment. The first four are situated in the southern part of the catchment: strong connectivity, reduction, concrete channel, and damage area. The remaining two, situated in the northern part are: artificial channel and drainage channels. Each of the six zones is characterized by different sediments and river processes. It was demonstrated that a more detailed and more probably connectivity pattern for hillslopes and river channels may be obtained through the use of several tools and parameters at the same time (i.e., fieldwork, SWAT, IC).