We address the effect of three groups of factors on supplementary ground surface displacements during tunnel construction. The first group of factors includes the engineering and geological properties of the massif in which the tunneling is conducted; the second group includes the structural features of the designed tunnels and surrounding buildings, and the third group includes the engineering parameters of the tunneling process. The research takes advantage of the geotechnical monitoring data obtained during the construction of underground facilities and the engineering parameters of shield tunneling during construction of single- and double-track Moscow underground lines by using EPB (earth pressure balance)–TBM (tunnel boring machines) in different soils. The dependence of additional displacements, occurring above the designed tunnel, on the TBM pressure, is addressed in detail. The presence of a close interdependence is evidenced by a correlation coefficient equal to 0.77. No dependence of the settlement on the diameter or depth of the designed tunnel, the distance from the tunnel axis to the monitored object, the loading that comes from a building in the affected area, or the boring rate was identified. The consideration of this parameter can be used to predict the soil displacement around the tunnel at construction facilities having similar geological profiles and boring parameters.
With the evolution of modern cosmopolitan cities, subterranean spaces have developed in dense urban environments. Hence, new metro tunnels often intersect with those in operation. The top-priority task of designers is to evaluate the effect of new construction projects. The experience accumulated in this field should contribute to the design of a realistic geotechnical model to simulate long-term displacements in the future. This paper includes a backward analysis of a design scheme developed for a tunnel construction area above an existing tunnel with a 10.3 m diameter, according to the results of geotechnical monitoring performed in PLAXIS 2D. The authors identified the optimum combination of the distance from the tunnel bottom to the lower boundary of the design model, the soil model, and tunnel lining stiffness. The authors derived regression equations describing vertical and horizontal displacements of the tunnel at the stage of excavation to the elevation datum as the excavation pit bottom. These equations can be applied to preliminarily predict the displacements of the tunnel depending on geometrical parameters at the initial design stage. Geometrical parameters include the distance from the tunnel to the excavation pit, the depth of the tunnel from the surface to the crown, the depth of the designed excavation pit, and the distance from the bottom of the excavation pit to the bottom of the tunnel. In addition, the effect of the Muir–Wood coefficient on the vertical displacements of the tunnel was investigated. This work found a reduction in the stiffness of the bearing structure of the tunnel and an increase of 4.8% in deformations on average when this coefficient was considered.
The construction of tunnels in conditions of dense urban development affects buildings, structures, and engineering communications located at the surface. In this work, through dispersion analysis, factors influencing the settlement of the earth’s surface and buildings during tunneling were selected. Subsequently, a model based on statistically significant parameters that can predict deformations at the pre-design stage was created. This research was conducted using data from geotechnical monitoring obtained during the construction of underground structures, with information about the technological parameters of shield tunneling in the construction of the single-track lines of the Moscow Metro using TBM with face-support pressure and engineering–geological conditions. In the obtained model, there is a clear dependency between the additional displacement of the monitoring object located above the projected tunnel and the average face-support pressure causing the mentioned deformations. The response is also affected by the soil deformation model at the tunnel face, the depth of the tunnel, and the soil excavation for the installation of one ring.
27 June 2023 in International Journal for Computational Civil and Structural Engineering
В результате активного освоения подземного пространства города Москвы, а также вследствие повышенной плотности застройки города необходимо осуществлять прогноз дополнительных перемещений окружающей застройки от нового строительства с целью предотвращения аварийных ситуаций. По этой причине одним из важных направлений является математическое моделирование прогноза дополнительных перемещений окружающей застройки после строительства. Установление параметров расчетных границ геотехнической модели - один из факторов, в значительной степени влияющих на результаты расчета. В данном исследовании рассматривается назначение нижней границы схемы при оценке влияния от тоннелепроходческих работ в двумерной постановке. Произведен обзор международного опыта моделирования глубины расчетной схемы для различных геотехнических задач и его сравнение с российским опытом моделирования схем. Для анализа были подобраны деформационные марки, располагающиеся на грунтовой поверхности в зоне влияния строящихся перегонных тоннелей Рублево-Архангельской и Троицкой (Коммунарской) линий Московского метрополитена. Авторы осуществили подбор нижней границы схемы, путем ее изменения пропорционально внешнему диаметру тоннелей в дисперсных и скальных грунтах. Полученные расчетные данные сравнивались с данными геодезического мониторинга. Расчеты производились для трех различных моделей грунта Mohr-Coulomb, Mohr-Coulomb с увеличением модуля деформации грунта призмы под выработкой и Hardening soil. Дополнительно расчеты производились для двух случаев назначения коэффициента перебора грунта - согласно нормативной документации и имеющимся исследованиям по данной теме. В результате проделанной работы было получено более 600 расчетных случаев, на основании которых были разработаны рекомендации по корректированию глубины схемы для рассмотренных моделей грунта.
Effect of secondary consolidation on long-term settlements of large-area raft foundations | Ter-Martirosyan | Construction: Science and Education Влияние вторичной консолидации на длительные осадки оснований фундаментных плит большой площади | Тер-Мартиросян | Строительство: наука и образование