As the demand for power supply increases, the investment in the power transmission system constantly increases. An accurate economic evaluation of the power transmission system is essential for future investment decisions and management. Applying a single method in economic evaluation leads to excessive subjective consciousness and unreasonable weight allocation. The Euclidean distance in the traditional TOPSIS method only partially works on the condition that the criteria are linearly correlated. To solve these problems, an economic evaluation method based on improved TOPSIS and BWM-anti-entropy weight is proposed. For the assignment of weights, the method retains the advantages of subjective and objective weighting methods based on the Nash equilibrium, breaks through the limitation of utilizing a single method, which contributes to one-sided results, and enhances the scientific rigor and rationality of the comprehensive weighting process. Furthermore, based on comprehensive weights, the method improves the TOPSIS by introducing the Mahalanobis distance and Pearson correlation coefficients, which can eliminate the influence of linear correlation. Finally, ten 500 kV transmission and transformation projects are analyzed and ranked to verify the method’s feasibility. Empirical analysis shows that the method can effectively evaluate the economic benefits of the power transmission system.
With the increasing integration of variable renewables, cascade hydro–photovoltaic (PV) systems face growing challenges in scheduling under PV output uncertainty. This paper proposes a risk-aware bi-level scheduling model based on the Information Gap Decision Theory (IGDT) to maximize renewable energy utilization while accommodating different risk preferences. The upper level optimizes the uncertainty horizon based on the decision-maker’s risk attitude (risk-neutral, opportunity-seeking, or risk-averse), while the lower level ensures operational feasibility under corresponding deviations in the PV and hydropower schedule. The bi-level model is reformulated into a single-level mixed-integer linear programming (MILP) problem. A case study based on four hydropower plants and two photovoltaic (PV) clusters in Southwest China demonstrates the effectiveness of the model. Numerical results show that the opportunity-seeking strategy (OS) achieves the highest total generation (68,530.9 MWh) and PV utilization (102.2%), while the risk-averse strategy (RA) improves scheduling robustness, reduces the number of transmission violations from 38 (risk-neutral strategy) to 33, and increases the system reserve margin to 20.1%. Compared to the conditional value-at-risk (CVaR) model, the RA has comparable robustness. The proposed model provides a flexible and practical tool for risk-informed scheduling in multi-energy complementary systems.
2 November 2023 in IEEE Transactions on Power Systems
This letter proposes an adaptive weighted ridge regression estimator for the identification of time-varying sensitivity. By decoupling the effect of forgetting factor and ridge parameter, we develop the online adaptive rules for these two parameters via alternating optimization. The proposed estimator exhibits not only a good tracking capability but also low steady-state misalignment.
15 July 2025 in IEEE Transactions on Transportation Electrification
Amid power outages during extreme events, the urban distribution network (DN) endeavors to minimize power loss and facilitate restoration by leveraging emerging technologies, particularly with the proliferation of electric vehicles (EVs). This work prioritizes bolstering DN resilience through network reconfiguration (NR), emergency repair crew (ERC) dispatch, and vehicle-to-grid (V2G) response, providing topology, repair schedule, and power support. To measure the power support effect of EVs, an agent-based model (ABM) estimates EV aggregation for V2G response, considering key factors such as EV number, type, self-interested decision-making, behaviors, and traffic conditions. By integrating these parameters at macro and micro levels, agents interact with one another, including EVs, charging stations (CSs), CS aggregators, DN operators, and personalized trip advisors (PTAs). PTA navigates EVs to locate the nearest CS. Considering the interdependence of the three restoration methods, coordinated optimization is designed as a mixed integer linear programming (MILP) with the IEEE 33 and PG&E 69 bus systems. The case study shows that the collaboration of these methods enhances load restoration efficiency and reduces operation costs. Sensitivity analysis on the number and type proportion of EVs and the number of ERCs offers guidance for DN operators in recovery planning.