Optimizing to increase the utilization ratio of regenerative braking energy reduces energy consumption, and can be done without increasing the deviation of train running time in one circle. The latter entails that the train timetable is upheld, which guarantees that the demand for passenger transport services is met and the quality of services in the urban rail transit system is maintained. This study proposes a multi-objective optimization model for urban railways with timetable optimization to minimize the total energy consumption of trains while maximizing the quality of service. To this end, we apply the principles and ideas of calculus to reduce the power of the velocity in the train energy consumption model. This greatly simplifies the complexity of the optimization model. Then, considering the conflicting requirements of decision-makers, weight factors are added to the objective functions to reflect decision-makers’ preferences for energy-saving and the quality of service. We adopt the nondominated sorting genetic algorithm-II (NSGA-II) to solve the proposed model. A practical case study of the Yizhuang urban railway line in Beijing is conducted to verify the effectiveness of the proposed model and evaluate the advantages of the optimal energy saving timetable (OEST) in comparison to the optimal quality of service timetable (OQOST). The results showed that the OEST reduced total energy consumption by 8.72% but increased the deviation of trains running time in one circle by 728 s. The total energy consumption was reduced by 6.09%, but there was no increase in the deviation of train running time in one circle with the OQOST.
Generally, when optimizing a rolling stock schedule, the locations of the depots, or places in the network where the composition changes and maintenance occurs, are assumed known. The locations where maintenance is performed naturally influence the quality of any resulting rolling stock schedules. In this paper, the problem of selecting new depot locations and their corresponding capacities is considered. A two-stage mixed integer programming approach for rolling stock scheduling with maintenance requirements is extended to account for depot selection. First, a conventional flow-based model is solved, ignoring maintenance requirements, to obtain a variety of rolling stock schedules with multiple depot locations and capacity options. Then, a maintenance feasible rolling stock schedule can be obtained by solving a series of assignment problems by using the schedules found in the first stage. The proposed methodology is tested on real-life instances, and the numerical experiments of different operational scenarios are discussed.
13 November 2022 in International Journal of Rail Transportation
Based on actual delay-recovery strategies (ADRS) on site only considers reducing the delays and ignores the operation cost of the enterprise. This study proposes optimized delay-recovery strategies (ODRS) to reduce the impact of delay on passengers and increase energy efficiency simultaneously. A bi-objective optimization model is used to deal with different initial delay scenarios and minimize the additional waiting time of passengers (AWTP) and total energy consumption (TEC). In the solving process, the non-dominated sorting genetic algorithm-II (NSGA-II) is used to solve the models, which can get the effective Pareto frontier solutions. Finally, Chengdu Metro is taken as the numerical experiments to verify the performance of the models. The results show that the ODRS can effectively reduce the AWTP and TEC than the ADRS. Furthermore, with the increase of initial delay time, the optimization effect of ODRS will be more obvious.
2 September 2023 in International Journal of Rail Transportation