14 October 2022 in Energies
Verified
Journal Article
Open access
PDF file
HCHonglin Chen
Honglin Chen
HYHao Yu
Hao Yu
XYXiaojuan Yang
Xiaojuan Yang
YLYong Lin
Yong Lin
SLSuhua Lou
Suhua Lou
SPSui Peng
Sui Peng
There are two situations of transmission redundancy and transmission congestion when large-scale offshore wind farms send power out. The energy storage system can store the power blocked by wind power due to insufficient transmission capacity and release it in the period when the wind power output level is low. In this paper, a full-life-cycle cost model is established for energy storage, and a joint planning model for offshore wind power storage and transmission considering carbon emission reduction benefits is established, which integrates power grid transmission benefits, carbon emission reduction benefits, energy storage construction costs, transmission project construction costs and wind abandonment penalty costs. The channel construction and energy storage configuration scheme with the greatest net benefit can be obtained. The relationship between the transmission channel capacity setting and the energy storage parameter configuration under this model is studied, and the combined effect of transmission channel and energy storage system in improving the level of wind power transmission is analyzed. The sensitivity analysis of the influence of the optimal storage and transmission planning scheme of the offshore wind farms is carried out from the perspectives of transmission line engineering cost and transmission channel curve type.

25 October 2022 in Processes
Verified
Journal Article
Open access
PDF file
JZJing Zuo
Jing Zuo
SPSui Peng
Sui Peng
YYYan Yang
Yan Yang
ZLZuohong Li
Zuohong Li
ZZZhengmin Zuo
Zhengmin Zuo
YLYong Lin
Yong Lin
Power systems face adequacy risks because of the high integration of renewable energy. It is urgent to develop efficient methods for power system operational reliability assessment. Conventional power system reliability assessment methods cannot achieve real-time assessment of system risk because of the high computational complexity and long calculation time. The high computational complexity is mainly caused by a large number of optimal power flow (OPF) calculations. To reduce the computational complexity, this paper transfers the optimal power flow model as a multiparameter linear programming model. Then, the optimal power flow can be obtained by linear calculations. Furthermore, this paper proposes a state reduction method considering the importance index of transmission lines for further improving the calculation efficiency. Case studies are carried out on IEEE standard systems and a provincial power grid in China. Compared with the conventional reliability assessment method, the reliability assessment efficiency of the proposed method increases by 10–40 times, and the assessment error is less than 1%.

13 October 2026 in Electronics
Verified
Journal Article
Open access
PDF file
WWWeijie Wu
Weijie Wu
RFRuijia Fan
Ruijia Fan
ZZZhengmin Zuo
Zhengmin Zuo
SPSui Peng
Sui Peng
Annual reserve scheduling is a crucial approach to maintaining the supply–demand balance in modern power systems. Existing studies, however, often overlook the deliverability of cross-area reserves limited by inter-area tie-lines and the impacts of persistent extreme renewable generation scenarios. To address these gaps, this paper proposes an annual reserve scheduling model for power systems that embeds sequential extreme scenarios. Based on the Load Block Curve (LBC) framework, the proposed model incorporates not only maintenance and operational constraints but also cross-area reserve transmission limits, upon which the sequential extreme scenario constraints are nested. Comparative case studies on a multi-area test system demonstrate that the proposed model effectively accounts for the reserve transmission limits of inter-area tie-lines, preventing reserve shortages by allocating sufficient localized reserves. Furthermore, it significantly mitigates the risk of load shedding by reserving additional capacity during periods vulnerable to potential extreme scenarios.