Suttichai Premrudeepeechacharn

Dr. Suttichai Premrudeepeechacharn


Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 July 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
SKSirote Khunkitti
Sirote Khunkitti
ASApirat Siritaratiwat
Apirat Siritaratiwat
SPSuttichai Premrudeepeechacharn
Suttichai Premrudeepeechacharn
Solving the optimal power flow problems (OPF) is an important step in optimally dispatching the generation with the considered objective functions. A single-objective function is inadequate for modern power systems, required high-performance generation, so the problem becomes multi-objective optimal power flow (MOOPF). Although the MOOPF problem has been widely solved by many algorithms, new solutions are still required to obtain better performance of generation. Slime mould algorithm (SMA) is a recently proposed metaheuristic algorithm that has been applied to solve several optimization problems in different fields, except the MOOPF problem, while it outperforms various algorithms. Thus, this paper proposes solving MOOPF problems based on SMA considering cost, emission, and transmission line loss as part of the objective functions in a power system. The IEEE 30-, 57-, and 118-bus systems are used to investigate the performance of the SMA on solving MOOPF problems. The objective values generated by SMA are compared with those of other algorithms in the literature. The simulation results show that SMA provides better solutions than many other algorithms in the literature, and the Pareto fronts presenting multi-objective solutions can be efficiently obtained.

29 August 2018 in Energies
Verified
Journal Article
Open access
PDF file
SKSirote Khunkitti
Sirote Khunkitti
ASApirat Siritaratiwat
Apirat Siritaratiwat
SPSuttichai Premrudeepeechacharn
Suttichai Premrudeepeechacharn
RCRongrit Chatthaworn
Rongrit Chatthaworn
Neville WatsonNeville Watson
Neville Watson
In this paper, a hybrid optimization algorithm is proposed to solve multiobjective optimal power flow problems (MO-OPF) in a power system. The hybrid algorithm, named DA-PSO, combines the frameworks of the dragonfly algorithm (DA) and particle swarm optimization (PSO) to find the optimized solutions for the power system. The hybrid algorithm adopts the exploration and exploitation phases of the DA and PSO algorithms, respectively, and was implemented to solve the MO-OPF problem. The objective functions of the OPF were minimization of fuel cost, emissions, and transmission losses. The standard IEEE 30-bus and 57-bus systems were employed to investigate the performance of the proposed algorithm. The simulation results were compared with those in the literature to show the superiority of the proposed algorithm over several other algorithms; however, the time computation of DA-PSO is slower than DA and PSO due to the sequential computation of DA and PSO.

21 November 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SKSirote Khunkitti
Sirote Khunkitti
ASApirat Siritaratiwat
Apirat Siritaratiwat
SPSuttichai Premrudeepeechacharn
Suttichai Premrudeepeechacharn
Since the increases in electricity demand, environmental awareness, and power reliability requirements, solutions of single-objective optimal power flow (OPF) and multi-objective OPF (MOOPF) (two or three objectives) problems are inadequate for modern power system management and operation. Solutions to the many-objective OPF (more than three objectives) problems are necessary to meet modern power-system requirements, and an efficient optimization algorithm is needed to solve the problems. This paper presents a many-objective marine predators algorithm (MaMPA) for solving single-objective OPF (SOOPF), multi-objective OPF (MOOPF), and many-objective OPF (MaOPF) problems as this algorithm has been widely used to solve other different problems with many successes, except for MaOPF problems. The marine predators algorithm (MPA) itself cannot solve multi- or many-objective optimization problems, so the non-dominated sorting, crowding mechanism, and leader mechanism are applied to the MPA in this work. The considered objective functions include cost, emission, transmission loss, and voltage stability index (VSI), and the IEEE 30- and 118-bus systems are tested to evaluate the algorithm performance. The results of the SOOPF problem provided by MaMPA are found to be better than various algorithms in the literature where the provided cost of MaMPA is more than that of the compared algorithms for more than 1000 USD/h in the IEEE 118-bus system. The statistical results of MaMPA are investigated and express very high consistency with a very low standard deviation. The Pareto fronts and best-compromised solutions generated by MaMPA for MOOPF and MaOPF problems are compared with various algorithms based on the hypervolume indicator and show superiority over the compared algorithms, especially in the large system. The best-compromised solution of MaMPA for the MaOPF problem is found to be greater than the compared algorithms around 4.30 to 85.23% for the considered objectives in the IEEE 118-bus system.

18 June 2019 in Energies
Verified
Journal Article
Open access
PDF file
SKSirote Khunkitti
Sirote Khunkitti
Neville WatsonNeville Watson
Neville Watson
RCRongrit Chatthaworn
Rongrit Chatthaworn
SPSuttichai Premrudeepeechacharn
Suttichai Premrudeepeechacharn
ASApirat Siritaratiwat
Apirat Siritaratiwat
Solving the Unit Commitment problem is an important step in optimally dispatching the available generation and involves two stages—deciding which generators to commit, and then deciding their power output (economic dispatch). The Unit Commitment problem is a mixed-integer combinational optimization problem that traditional optimization techniques struggle to solve, and metaheuristic techniques are better suited. Dragonfly algorithm (DA) and particle swarm optimization (PSO) are two such metaheuristic techniques, and recently a hybrid (DA-PSO), to make use of the best features of both, has been proposed. The original DA-PSO optimization is unable to solve the Unit Commitment problem because this is a mixed-integer optimization problem. However, this paper proposes a new and improved DA-PSO optimization (referred to as iDA-PSO) for solving the unit commitment and economic dispatch problems. The iDA-PSO employs a sigmoid function to find the optimal on/off status of units, which is the mixed-integer part of obtaining the Unit Commitment problem. To verify the effectiveness of the iDA-PSO approach, it was tested on four different-sized systems (5-unit, 6-unit, 10-unit, and 26-unit systems). The unit commitment, generation schedule, total generation cost, and time were compared with those obtained by other algorithms in the literature. The simulation results show iDA-PSO is a promising technique and is superior to many other algorithms in the literature.

31 December 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
PAPhiraphat - Antarasee
Phiraphat - Antarasee
SPSuttichai Premrudeepeechacharn
Suttichai Premrudeepeechacharn
ASApirat Siritaratiwat
Apirat Siritaratiwat
SKSirote Khunkitti
Sirote Khunkitti
The fast development of electric vehicles (EVs) has resulted in several topics of research in this area, such as the development of a charging pricing strategy, charging control, location of the charging station, and the structure within the charging station. This paper proposes the optimal design of the structure of an EV fast-charging station (EVFCS) connected with a renewable energy source and battery energy storage systems (BESS) by using metaheuristic algorithms. The optimal design of this structure aims to find the number and power of chargers. Moreover, the renewable energy source and BESS can reduce the impact on the grid, so these energy sources are considered as ones of the optimally-designed structure of EVFCS in this work. Thus, it is necessary to determine the optimal sizing of the renewable energy source, BESS, and the grid power connected to EVFCS. This optimal structure can improve the profitability of the station. To solve the optimization problem, three metaheuristic algorithms, including particle swarm optimization (PSO), Salp swarm algorithm (SSA), and arithmetic optimization algorithm (AOA), are adopted. These algorithms aim to find the optimal structure which maximizes the profit of the EVFCS determined by its net present value (NPV), and the results obtained from these algorithms were compared. The results demonstrate that all considered algorithms could find the feasible solutions of the optimal design of the EVFCS structure where PSO provided the best NPV, followed by AOA and SSA.

18 June 2024 in Batteries
Verified
Journal Article
Open access
PDF file
SKSirote Khunkitti
Sirote Khunkitti
NPNatsawat Pompern
Natsawat Pompern
SPSuttichai Premrudeepeechacharn
Suttichai Premrudeepeechacharn
ASApirat Siritaratiwat
Apirat Siritaratiwat
Installing a battery energy storage system (BESS) and renewable energy sources can significantly improve distribution network performance in several aspects, especially in electric vehicle (EV)-integrated systems because of high load demands. With the high costs of the BESS and PV, optimal placement and capacity of them must be carefully considered. This work proposes a solution for determining the optimal placement and capacity of a BESS and photovoltaic (PV) in a distribution system by considering EV penetrations. The objective function is to reduce system costs, comprising installation, replacement, and operation and maintenance costs of the BESS and PV. The replacement cost is considered over 20 years, and the maintenance and operation costs incurred in the distribution system include transmission line loss, voltage regulation, and peak demand costs. To solve the problem, two metaheuristic algorithms consisting of particle swarm optimization (PSO) and the African vulture optimization algorithm (AVOA) are utilized. The tenth feeder of Phitsanulok substation 1 (PLA10), Thailand, which is a 91-bus distribution network, is tested to evaluate the performance of the proposed approach. The results obtained from the considered algorithms are compared based on distribution system performance enhancement, payback period, and statistical analysis. It is found from the simulation results that the installation of the BESS and PV could significantly minimize system cost, improve the voltage profile, reduce transmission line loss, and decrease peak demand. The voltage deviation could be reduced by 86%, line loss was reduced by 0.78 MW, and peak demand could be decreased by 5.706 MW compared to the case without BESS and PV installations.