Brian McFall

Dr. Brian McFall

orcid

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2016 in Proceedings of the Royal Society A: Mathematical, Physical and Engineering Sciences
Verified
Journal Article
Open access
BMBrian McFall
Brian McFall
HFHermann M. Fritz
Hermann M. Fritz
Tsunamis generated by landslides and volcanic island collapses account for some of the most catastrophic events recorded, yet critically important field data related to the landslide motion and tsunami evolution remain lacking. Landslide-generated tsunami source and propagation scenarios are physically modelled in a three-dimensional tsunami wave basin. A unique pneumatic landslide tsunami generator was deployed to simulate landslides with varying geometry and kinematics. The landslides were generated on a planar hill slope and divergent convex conical hill slope to study lateral hill slope effects on the wave characteristics. The leading wave crest amplitude generated on a planar hill slope is larger on average than the leading wave crest generated on a convex conical hill slope, whereas the leading wave trough and second wave crest amplitudes are smaller. Between 1% and 24% of the landslide kinetic energy is transferred into the wave train. Cobble landslides transfer on average 43% more kinetic energy into the wave train than corresponding gravel landslides. Predictive equations for the offshore propagating wave amplitudes, periods, celerities and lengths generated by landslides on planar and divergent convex conical hill slopes are derived, which allow an initial rapid tsunami hazard assessment.

11 April 2018 in Landslides
Verified
Journal Article
Closed access
PDF file
BMBrian McFall
Brian McFall
FMFahad Mohammed
Fahad Mohammed
HFHermann M. Fritz
Hermann M. Fritz
YLYibin Liu
Yibin Liu

30 August 2017 in Journal of Geophysical Research: Oceans
Verified
Journal Article
Open access
PDF file
BMBrian McFall
Brian McFall
HFHermann M. Fritz
Hermann M. Fritz
Large‐scale physical model experiments of tsunamis generated by granular landslides and volcanic flank collapses are conducted to study the wave runup on both the hill slope laterally adjacent to the landslide and an opposing hill slope. A pneumatic landslide tsunami generator was deployed on planar and convex conical hill slopes to simulate deformable landslides with various geometries and kinematics. On the landslide hill slope, maximum runup and rundown were observed in the landslide impact region followed by adjacent second maxima after the lateral waves were fully formed. The runup and rundown decayed asymptotically from the second maxima. In the conical island scenario, a localized runup amplification was measured on the lee side of the island. Outside the landslide impact region, the effects of the landslide granulometry on the lateral wave runup are minimal. The lateral wave runup on the planar hill slope was generally larger than on the convex conical hill slope outside the landslide impact region. The convex conical hill slope traps less lateral wave energy. The zeroth mode of the edge wave dispersion relation matched the first and second lateral waves on the planar hill slope and the first wave on the convex conical hill slope. Predictive equations for the laterally propagating wave characteristics are derived and a method to predict the runup on an opposing hill slope is presented. The predictive wave and runup equations are benchmarked against the 2007 landslide‐generated tsunami in Chehalis Lake, British Columbia, Canada.

1 September 2021 in Journal of Waterway, Port, Coastal, and Ocean Engineering
Verified
Journal Article
Open access
PDF file
BMBrian McFall
Brian McFall
KBKatherine E. Brutsché
Katherine E. Brutsché
APAnthony M. Priestas
Anthony M. Priestas
DKDouglas R. Krafft
Douglas R. Krafft
Maintaining navigable waterways through dredging is vital to society and the economy, especially as global transport and cargo loads increase. Decision makers require rapid techniques to evaluate potential placement alternatives for the dredged sediment. When appropriate, dredged sediment can be placed in the nearshore as a berm or a mound, often with the expectations of dissipating wave energy further offshore and inducing shoreward sediment transport. However, the exact placement area requires the water depth, hydrodynamic climate, and sediment size to be considered. Previous work used the well-known depth of closure concept to assess berm stability. A web-based Sediment Mobility Tool (SMT) was recently developed to assess the probability of sediment transport and direction with the knowledge of a few simple parameters. In this study, 20 historical projects that placed dredged sediment in the nearshore are reviewed to evaluate the depth of closure equations predictive capability on berm stability. The frequency of sediment mobilization and cross-shore transport direction are estimated for nine historical projects. The evaluated projects represent a diverse range of construction methods, placement geometries, sediment characteristics, and wave climates. The techniques used to estimate sediment mobilization frequency and transport direction are universal. These techniques are an essential step for engineers and planners to evaluate the potential volumes of dredged material that nearshore placement operations might yield to nourish a beach profile.

Verified
Journal Article
Open access
PDF file
SMSean McGill
Sean McGill
BHBrian D. Harris
Brian D. Harris
BMBrian McFall
Brian McFall
DKDouglas Robertson Krafft
Douglas Robertson Krafft
RBRachel L. Bain
Rachel L. Bain
MCMonica A. Chasten
Monica A. Chasten
Nearshore nourishment is a common coastal flood risk management technique that can be constructed beneficially by using dredged sediment from navigation channels. A nearshore nourishment project was completed during the summer of 2021 in Harvey Cedars, NJ, USA, with 67,500 m3 of dredged sediment from Barnegat Inlet placed along approximately 450 m of beach in a depth of 3–4 m. In situ instruments were installed to monitor hydrodynamic conditions before and after dredged material placement, and nine topographic and bathymetric surveys were conducted to monitor nearshore morphological response to the nourishment. Shoreline location was extracted from satellite imagery using CoastSat software to compare historical trends to the shoreline response after construction. Seven months after construction, 40% of the nearshore nourishment was transported from the initial footprint and the centroid of the nourishment migrated towards shore and alongshore (north). The sheltering capacity of the nearshore berm appears to have captured an additional 58% of the placed volume from the longshore transport system and the beach width onshore of the placement increased by 10.9 m. Measured data, satellite imagery analysis, and rapid predictions all indicate that the nearshore nourishment at Harvey Cedars had a positive impact on the adjacent beach.