Carol Johnstone

Dr. Carol Johnstone

Fermilab, Batavia, IL 60510, USA

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 April 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RSReinhard W Schulte
Reinhard W Schulte
CJCarol Johnstone
Carol Johnstone
SBSalime Boucher
Salime Boucher
EEEric Esarey
Eric Esarey
CGCameron G. R. Geddes
Cameron G. R. Geddes
JTJeroen Van Tilborg
Jeroen Van Tilborg
The general concept of radiation therapy used in conventional cancer treatment is to increase the therapeutic index by creating a physical dose differential between tumors and normal tissues through precision dose targeting, image guidance, and radiation beams that deliver a radiation dose with high conformality, e.g., protons and ions. However, the treatment and cure are still limited by normal tissue radiation toxicity, with the corresponding side effects. A fundamentally different paradigm for increasing the therapeutic index of radiation therapy has emerged recently, supported by preclinical research, and based on the FLASH radiation effect. FLASH radiation therapy (FLASH-RT) is an ultra-high-dose-rate delivery of a therapeutic radiation dose within a fraction of a second. Experimental studies have shown that normal tissues seem to be universally spared at these high dose rates, whereas tumors are not. While dose delivery conditions to achieve a FLASH effect are not yet fully characterized, it is currently estimated that doses delivered in less than 200 ms produce normal-tissue-sparing effects, yet effectively kill tumor cells. Despite a great opportunity, there are many technical challenges for the accelerator community to create the required dose rates with novel compact accelerators to ensure the safe delivery of FLASH radiation beams.

13 December 2003 in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
Verified
Journal Article
Closed access
CJCarol Johnstone
Carol Johnstone
MBM Berz
M Berz
DED Errede
D Errede
KMK Makino
K Makino

1 March 2006 in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
Verified
Journal Article
Closed access
CJCarol Johnstone
Carol Johnstone
MBM. Berz
M. Berz
KMK. Makino
K. Makino

23 April 2004
Verified
Conference Paper
Closed access
CJCarol Johnstone
Carol Johnstone
MBM. Berz
M. Berz
DED. Errede
D. Errede
KMK. Makino
K. Makino
Schemes for intense sources of high-energy muons require collection, rf capture, and transport of particle beams with unprecedented emittances, both longitudinally and transversely. These large emittances must be reduced or "cooled" both in size and in energy spread before the muons can be efficiently accelerated. Therefore, formation of muon beams sufficiently intense to drive a Neutrino Factory or Muon Collider requires multi-stage preparation. Further, because of the large beam phase space which must be successfully controlled, accelerated, and transported, the major stages that comprise such a facility: proton driver, production, capture, phase rotation, cooling, acceleration, and storage are complex and strongly interlinked. Each of the stages must be consecutively matched and simultaneously optimized with upstream and downstream systems, meeting challenges not only technically in the optics and component design, but also in the modeling of both new and extended components. One design for transverse cooling, for example, employs meter-diameter solenoids to maintain strong focusing - 300-500 mr beam divergences - across ultra-large momentum ranges, /spl ges/ /spl plusmn/20% /spl delta/p/p, defying conventional approximations to the dynamics and field representation. To now, the interplay of the different systems and staging strategies has not been formally addressed. This work discusses two basic, but different approaches to a Neutrino Factory and how the staging strategy depends on beam parameters and method of acceleration.

15 February 2006
Verified
Conference Paper
Closed access
CJCarol Johnstone
Carol Johnstone
ABA. Bross
A. Bross
IRI. Rakhno
I. Rakhno
A new experimental area designed to develop, test and verify muon ionization cooling apparatus using the 400-MeV Fermilab Linac proton beam began construction in spring, 2002. This area will be used initially for cryogenic tests of liquid-hydrogen absorbers for the MUCOOL R&D program and, later, for high-power beam tests of these absorbers and other prototype muon-cooling apparatus. The experimental scenarios being developed for muon facilities involve collection, capture, and cooling of large-emittance, high-intensity muon beams--∼ 1013 muons at a repetition rate of 15Hz, so that conclusive tests of the apparatus require full Linac beam, or 1.6 x 1013 p at 15 Hz. To support the muon cooling facility, a new primary beamline will divert beam from the Linac to the test facility. Located southwest of Wilson Hall between the Linac berm and parking lot, implementation of the facility and associated beamline takes advantage of civil construction and resources that remain from the 400-MeV Linac Upgrade Project. The design concept for the MuCool facility is taken from an earlier proposal[1], but modifications to the existing proposal were necessary to accommodate high-intensity beam, cryogenics, and the increased scale of the cooling experiments. This paper reports on the initial low-intensity (Phase I) implementation of the MuCool Test Area (MTA).

12 June 2018 in arXiv
Verified
Preprint
Open access
PDF file
JJJohn A. Johnstone
John A. Johnstone
CJCarol Johnstone
Carol Johnstone
This paper investigates the feasibility of re-purposing the MuCool Test Area (MTA) beamline and experimental hall to support a Muon Spin Resonance (MuSR) facility, which would make it the only such facility in the US. This report reviews the basic muon production concepts studied and operationally implemented at TRIUMF, PSI, and RAL and their application in the context of the MTA facility. Two scenarios were determined feasible. One, an initial minimal-shielding and capital-cost investment stage with a single secondary muon beamline that utilizes an existing high-intensity beam absorber and, another, upgraded stage, that implements an optimized production target pile, a proximate high-intensity absorber, and optimized secondary muon lines. A unique approach is proposed which chops or strips a macropulse of H- beam into a micropulse substructure - a muon creation timing scheme - which allows Muon Spin Resonance experiments in a linac environment. With this timing scheme, and attention to target design and secondary beam collection, the MTA can host enabling and competitive Muon Spin Resonance experiments.