Sílvio Carmo-Silva

Dr. Sílvio Carmo-Silva

University of Minho, Braga, Portugal
orcid

Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2006 in International Journal of Production Economics
Verified
Journal Article
Closed access
Nuno FernandesNuno Fernandes
Nuno Fernandes
SCSílvio Carmo-Silva
Sílvio Carmo-Silva

1 May 2011 in International Journal of Production Economics
Verified
Journal Article
Closed access
Nuno FernandesNuno Fernandes
Nuno Fernandes
SCSílvio Carmo-Silva
Sílvio Carmo-Silva

15 April 2010 in International Journal of Production Research
Verified
Journal Article
Closed access
Nuno FernandesNuno Fernandes
Nuno Fernandes
SCSílvio Carmo-Silva
Sílvio Carmo-Silva
International audienceIn this paper, we report a simulation study on the role of sequence-dependent set-up times in decision making at the order release level of a workload controlled make-to-order flow-shop. The study evaluates the potential for set-ups savings, dependent on the level of workload in the shop, for two alternative strategies, namely considering set-up times centrally, within the release decision or locally, within the dispatching decision. These strategies are compared and assessed on the basis of two main performance measures namely time in system and standard deviation of the job lateness. Results indicate that the local strategy, which has been traditionally adopted in practice and in most of the studies dealing with sequence-dependent set-up times, does not always give the best results. The release frequency and the shop workload appear critical to the selection of the strategy to adopt, strongly influencing system performance

19 March 2020 in Enterprise Information Systems
Verified
Journal Article
Closed access
LMLuis Martins
Luis Martins
Leonilde VarelaLeonilde Varela
Leonilde Varela
Nuno FernandesNuno Fernandes
Nuno Fernandes
SCSílvio Carmo-Silva
Sílvio Carmo-Silva
José MachadoJosé Machado
José Machado
Production environments are becoming more complex and dynamics. This is influenced by external factors related with products’ characteristics and costumers’ requirements and internal factors related with processing times variability, machine failures, setup times, between others. To face this increasing complexity and dynamics, it is crucial to have effective production control methods, considering Interoperability Enablers for Cyber-Physical Systems. However, production control methods most in used today, are focused on centralised decision-making and planning, and considered inadequate to deal with the increasing dynamics of these systems. Autonomous Production Control (APC) may be an adequate alternative to face this complexity, allowing flexible and rapid reaction to possible disturbances that may occur in the production system. However, as APC is the relatively new concept, there are no existing surveys. Therefore, we review and discuss the literature on APC methods to bring more attention to this promising topic of research, highlighting future research directions.

1 December 2017 in International Journal of Production Economics
Verified
Journal Article
Open access
Nuno FernandesNuno Fernandes
Nuno Fernandes
MTMatthias Thürer
Matthias Thürer
CSCristóvão Silva
Cristóvão Silva
SCSílvio Carmo-Silva
Sílvio Carmo-Silva
Order release is a key component of Workload Control - a production planning and control system that aims at balancing workloads across workstations, while ensuring the timely release of jobs (or orders) to the shop floor in order to meet due dates. Several release methods have been proposed and evaluated in the WLC literature. A major criterion to distinguish between release methods is whether they take the release decision at periodic time intervals or continuously. This paper aims at improving WLC order release by incorporating a starvation avoidance trigger into continuous release. Using simulation, we demonstrate that significant performance improvements in terms of mean tardiness and standard deviation of lateness can be obtained. These results are expected to have important implications for industrial practice and for future research on WLC.info:eu-repo/semantics/publishedVersio

5 November 2015 in International Journal of Production Research
Verified
Journal Article
Closed access
Nuno FernandesNuno Fernandes
Nuno Fernandes
MLMartin J. Land
Martin J. Land
SCSílvio Carmo-Silva
Sílvio Carmo-Silva
This paper addresses the problem of lot splitting in the context of workload control (WLC). Past studies on WLC assumed that jobs released to the shop floor proceed through the different stages of processing without being split. However, in practice, large jobs are often split into smaller transfer sublots so that they can move more quickly and independently through the production process and allow operations overlapping relating to the same job. This paper assesses the performance of different lot splitting policies for job release and dispatching strategies under lot splitting. A new dispatching rule was designed to specifically take advantage of lot splitting and operations overlapping in the context of WLC. Discrete-event simulation is used to assess system performance in relation to the ability to provide shorter delivery times and on time deliveries. Results highlight the importance of releasing the sublots of the same job together and demonstrate that combining an effective lot splitting policy with an appropriate dispatching rule can enhance the performance of production systems.