The proposal of this paper is to share the knowledge learned in this new procedure and techniques implemented in HP/HT Unconventional wells, created by the Unconventional (UC) Drilling Department at Abu Dhabi which involve around ten different services, where each has a high importance and contribution for the collective success of the well at the moment to frac and hence the feasibility of the project. In order to assure the integrity and accessibility of the Frac String during Plug and Perf hydraulic fracturing operations of one of the toughest rock in Unconventional business worldwide, one procedure has been developed for running operations best practices. Pressure testing the Frac String (FS) during running in hole in stages while in vertical section to sure safe and successful Wireline setting and retrieving nipples plug with more than 30% solids in the system (high mud weight) to guarantee no leak in the string prior reaching total depth (TD). Hanging and testing cross over (XO), assuring compatibility with the wellhead connections. Cementing up to18.7 ppg. Flexible and expandable slurries, cement inside previous casing and apply pressure on surface to avoid gas percolation during the cement setting period. Cleaning out with Coiled tubing (CT) to ensure no obstruction and using different completion fluids for future accessibility. And finally, Pressure testing the Frac string up to 14ksi all are new practices and proven mitigation measures for all assessed risks for hydraulic fracturing operations. This paper is about sharing this new procedure in Abu Dhabi for having a cemented FS in UC wells High Pressure / High Temperature (HP/HT) with 100% integrity and internal accessibility to run plugs, perforations, logs and be able to apply high surface pressure to frac the tight reservoir in the planned zone, creating the desired permeability for future production.