As one of the important hydrological elements of rivers, flow is of great significance to the development and utilization of water resources and the ecological environment. Based on the excellent nonlinear processing capability of CEEMDAN and the advantages of BILSTM in time-series data modeling, a coupled CEEMDAN-BILSTM model is constructed for flow prediction, and the i-month flows from 1951 to 2016 are used to predict the i-month flows from 2017 to 2021. The results show that the CEEMDAN-BILSTM coupled model predicts the trend more closely with the actual data variation, and the minimum relative error is 0.56 and maximum 9.48, which are maintained within 10%, and the deterministic coefficients are all greater than 0.9, so the prediction accuracy is high. The flow in month i of 5 years was picked up by monthly predictions for 66 consecutive years, which provides a new way of thinking about the prediction of river flow.
Water resources are vital to the development of human society, and mastering the law of runoff changes is the basis for achieving sustainable use of water resources. To study the impact of reservoir construction on the changes of downstream river runoff, this paper decomposes the runoff before and after reservoir construction using the Complete Ensemble Empirical Mode Decomposition with Adaptive Noise (CEEMDAN) method based on the runoff data from the Huayuankou hydrological station. The fluctuation characteristics of each decomposition series of runoff before and after reservoir construction and the intra-annual variation pattern of runoff are also analyzed by combining multi-time information entropy and coefficient of variation. The results show that after the operation of the Xiaolangdi Reservoir, the annual runoff variation cycle tends to be flat, and the monthly runoff cycle is significantly reduced. After reservoir construction, the entropy values of each IMF and Res of runoff become larger, the complexity and randomness of runoff changes increase, and predictability decreases. Before and after the operation of the Xiaolangdi Reservoir, the coefficient of variation of runoff were 0.28–1 and 0.38–0.83, the distribution of runoff was more uniform, and the percentage of runoff in the flood season was reduced from 51.51 to 39.89%.
10 February 2023 in Environmental Monitoring and Assessment