Massimo Vaccarini

Prof. Massimo Vaccarini

Marche Polytechnic University, Ancona, Marche, Italy
orcid

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2013 in Automation in Construction
Verified
Journal Article
Closed access
BNBerardo Naticchia
Berardo Naticchia
MVMassimo Vaccarini
Massimo Vaccarini
ACAlessandro Carbonari
Alessandro Carbonari

1 June 2019 in Automation in Construction
Verified
Journal Article
Closed access
Andrea BonciAndrea Bonci
Andrea Bonci
ACAlessandro Carbonari
Alessandro Carbonari
ACAlessandro Cucchiarelli
Alessandro Cucchiarelli
LMLeonardo Messi
Leonardo Messi
MPMassimiliano Pirani
Massimiliano Pirani
MVMassimo Vaccarini
Massimo Vaccarini

1 February 2009 in Journal of Process Control
Verified
Journal Article
Closed access
MVMassimo Vaccarini
Massimo Vaccarini
SLSauro Longhi
Sauro Longhi
MKM. Reza Katebi
M. Reza Katebi

14 October 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
ACAlessandro Carbonari
Alessandro Carbonari
CCCarlos Franco Cienfuegos
Carlos Franco Cienfuegos
BNBerardo Naticchia
Berardo Naticchia
FSFrancesco Spegni
Francesco Spegni
MVMassimo Vaccarini
Massimo Vaccarini
This paper contributes to a sustainable construction design management approach to increase the successful renovation rate of existing residential building stock. Indeed, coupling BIM with mixed reality can speed up and improve the quality of the renovation design processes, because it can display virtual models of alternative design scenarios superimposed over the existing physical facility. To this purpose, a sample of technicians was enrolled to test the reliability of this technology. A prototype was developed that enables cooperation among stakeholders and the implementation of an efficient workflow. The volunteers carried out real-life tests in a building demonstrator in Caceres (Spain) and filled in two questionnaires with their feedback. The results showed that an MR-based platform can involve interested stakeholders in the assessment of renovation design projects, that speeds up the decision-making process and increases the quality of those projects. Moreover, technicians can master the technology quickly, provided that it is included in the current renovation workflow and some technology gaps are covered. However, the main limitations of this study are that these findings are valid for building renovation design only, and the tests were performed in a controlled, yet full scale, experimental environment. Finally, this paper deals with a few open technical issues, such as the efficient alignment of holograms, transformation of BIM models into a format suitable for mixed reality applications and sharing feedbacks in an on-line repository to foster collaboration.

1 March 2016 in Energy and Buildings
Verified
Journal Article
Closed access
MVMassimo Vaccarini
Massimo Vaccarini
AGA. Giretti
A. Giretti
LTL.C. Tolve
L.C. Tolve
MCM. Casals
M. Casals

1 March 2016 in Applied Energy
Verified
Journal Article
Open access
MCMiquel Casals
Miquel Casals
Marta GangolellsMarta Gangolells
Marta Gangolells
Núria ForcadaNúria Forcada
Núria Forcada
MMMarcel Macarulla
Marcel Macarulla
AGAlberto Giretti
Alberto Giretti
MVMassimo Vaccarini
Massimo Vaccarini
Several previous research initiatives have highlighted the role of Information and Communication Technologies (ICT) as key enablers for decreasing energy usage in buildings. However, few advances have been achieved in underground public spaces. This paper introduces a novel intelligent energy management system for underground stations. The system implements artificial intelligence solutions for autonomous building system control, based on advanced control algorithms that can learn from previous operations and situations. The robustness needed to operate in public spaces is achieved through a seamlessly integrated monitoring grid with self-diagnosis mechanisms. A middleware platform integrates existing devices, subsystems and newly deployed sensor-actuator networks. Results obtained during the implementation of the system in a prototype underground station showed potential yearly energy savings ranging between 74,336 and 87,339 kW h. The highest energy savings potential was found in the ventilation subsystem (30.6% +/- 2.0%), followed by the lighting system (24.1% +/- 1.9%) and escalators (8.5% +/- 1.9%).Peer ReviewedPostprint (author's final draft