Suzhen Feng

Ms. Suzhen Feng


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 December 2022 in Water
Verified
Journal Article
Open access
PDF file
BZBinbin Zhou
Binbin Zhou
SFSuzhen Feng
Suzhen Feng
XZxu zifan
xu zifan
JJJiang yan Yan Jiang
Jiang yan Yan Jiang
YWYouxiang Wang
Youxiang Wang
JWJinwen Wang
Jinwen Wang
A monthly hydropower scheduling determines the monthly flows, storage, and power generation of each reservoir/hydropower plant over a planning horizon to maximize the total revenue or minimize the total operational cost. The problem is typically a complex and nonlinear optimization that involves equality and inequality constraints including the water balance, hydraulic coupling between cascaded hydropower plants, bounds on the reservoir storage, etc. This work applied the Zoutendijk algorithm for the first time to a medium/long-term hydropower scheduling of cascaded reservoirs, where the generating discharge capacity is handled with an iterative procedure, while the other head-related nonlinear constraints are represented with exponential functions fitting to discrete points. The procedure starts at an initial feasible solution, from which it finds a feasible improving direction, along which a better feasible solution is sought with a one-dimensional search. The results demonstrate that the Zoutendijk algorithm, when applied to six cascaded hydropower reservoirs on the Lancang River, worked very well in maximizing the hydropower production while ensuring the highest firm power output to be secured.

28 April 2022 in Energies
Verified
Journal Article
Open access
PDF file
MXMengfei Xie
Mengfei Xie
SFSuzhen Feng
Suzhen Feng
JWJinwen Wang
Jinwen Wang
MZMaolin Zhang
Maolin Zhang
CCCheng Chen
Cheng Chen
This work formulates a stochastic dynamic programming (SDP) model that incorporates seasonal electricity prices and can handle a constraint on power yield, which is assumed to be satisfied at any time it is possible, thus allowing for an analysis of their impacts on the operational performances of cascaded reservoirs. The model is applied to the Lancang Cascade, specifically its two largest reservoirs, Xiaowan and Nuozhadu. The results show that increasing the power yield of the cascade will reduce energy production unfavorably but will impact water spillage favorably, with a power yield of 2000 MW and with a 91% reliability suggested as being a satisfactory operational target. The case study also suggests that using seasonal electricity prices makes the power generation very unstable during weeks 12–20, which is a period of time that is critical to transferring from dry to flooding seasons.

31 August 2023 in Water
Verified
Journal Article
Open access
PDF file
SLShuangquan Liu
Shuangquan Liu
GQGuoyuan Qian
Guoyuan Qian
XZxu zifan
xu zifan
SFsuzhen Feng
suzhen Feng
KCKai Chen
Kai Chen
SFSuzhen Feng
Suzhen Feng
This study introduces a novel approach for optimizing the monthly hydropower scheduling of cascaded reservoirs by employing a special ordered set of type 2 (SOS2) formulation within a mixed integer linear programming (MILP) model. The proposed method linearizes the relationships between hydropower output, spillage, storage, and outflow, enabling controllable spillage. The objective is to minimize spillage, maximize firm hydropower output, and maximize energy production, all in priority while considering complex constraints such as reservoir storage and discharge bounds, upstream–downstream relationship, and water balance. The approach is applied to four cascaded reservoirs on the Lancang River. Results indicate that the SOS2 formulation effectively minimizes spillage, maximizes hydropower generation, and ensures maximum firm power output. Comparisons across different gridding resolutions reveal that more grid points yield greater benefits but with a longer solution time. Furthermore, a comparison with the Successive Quadratic Programming (SQP) method highlights the superior performance of the SOS2 model in terms of objective improvement and solution efficiency. This research offers valuable insights into optimizing monthly hydropower scheduling for cascaded reservoir systems, enhancing operational efficiency and decision-making in water resources management.