This paper aims to investigate the efficiency of the value-at-risk (VaR) backtests in the model selection from different types of generalised autoregressive conditional heteroskedasticity (GARCH) models with skewed and non-skewed innovation distributions. Extensive simulation is carried out to compare the model selection based on VaR backtests and Akaike Information Criteria (AIC). When the model is given but the innovation distribution is one of the six selected distributions which may be skewed or non-skewed, the simulation results show that both AIC and the VaR backtests succeed in selecting the correct innovation distribution from the set of six distributions under consideration. This indicates that both AIC and the VaR backtests are able to distinguish between skewed and non-skewed distributions when the innovation distribution is misspecified. Using an empirical data from NASDAQ index, we observe that the selected combination of model and innovation distribution based on the smallest AIC does not agree with that selected by using the in-sample VaR backtests. Examination of confidence limits for VaR and the expected shortfall forecasts under various loss functions provides evidence that the selected combination of model and innovation distribution using the VaR backtests tends to possess smaller mean absolute percentage error and logarithmic loss.
Bitcoin (BTC), as the dominant cryptocurrency, has attracted tremendous attention lately due to its excessive volatility. This paper proposes the time-varying transition probability Markov-switching GARCH (TV-MSGARCH) models incorporated BTC logarithmic daily trading volume or Google daily searches as exogenous factors to model the volatility dynamics of BTC return series. Extensive comparisons were carried out to evaluate the modelling and forecasting performances of TV-MSGARCH models with the benchmark models such as GARCH, GJRGARCH, threshold GARCH and constant transition probability MSGARCH. Results reveal that the TV-MSGARCH models predominate other models for the in-sample model fitting based on log-likelihood function and other benchmark criteria. Furthermore, the TV-MSGARCH model with Google daily searches offers the best out-of-sample forecast evaluated based on quasi-likelihood loss function and also using Hansen’s model confidence set. In addition, the Filardo’s weighted transition probabilities is computed and the results show the existence of time-varying effect on transition probabilities. Lastly, new approach for computing different levels of long and short positions of value-at-risk forecasts based on TV-MSGARCH models are also provided and tested.
Shewhart charts are the most commonly utilised control charts for process monitoring in industries with the assumption that the underlying distribution of the quality characteristic is normal. However, this assumption may not always hold true in practice. In this paper, the weighted-variance mean charts are developed and their population standard deviation is estimated using the three subgroup scale estimators, namely the standard deviation, median absolute deviation and standard deviation of trimmed mean for monitoring Weibull distributed data with different coefficients of skewness. This study aims to compare the out-of-control average run length of these charts with the pre-determined fixed value of the in-control ARL in terms of different scale estimators, coefficients of skewness and sample sizes via extensive simulation studies. The results indicate that as the coefficients of skewness increase, the charts tend to detect the out-of-control signal more rapidly under identical magnitude of shift. Meanwhile, as the size of the shift increases under the same coefficient of skewness, the proposed charts are able to locate the shifts quicker and the similar scenarios arise as a sample size raised from 5 to 10. A real data set from survival analysis domain which, possessing Weibull distribution, was to demonstrate the usefulness and applicability of the proposed chart in practice.
1 January 2011 in Mathematical Problems in Engineering
Monitoring a process over time using a control chart allows quick detection of unusual states. In phase I, some historical process data, assumed to come from an in‐control process, are used to construct the control limits. In Phase II, the process is monitored for an ongoing basis using control limits from Phase I. In Phase II, observations falling outside the control limits or unusual patterns of observations signal that the process has shifted from in‐control process settings. Such signals trigger a search for assignable cause and, if the cause is found, corrective action will be implemented to prevent its recurrence. The purpose of this paper is to introduce a new methodology appropriate for constructing a robust control chart when a nonnormal or a contaminated data that may arise in phase I state. Through extensive Monte Carlo simulations, we examine the behaviors and performances of the proposed MM robust control chart when there is a process shift in mean.