In this study, a pitch H-infinity control algorithm was developed for variable-speed–variable-pitch (VSVP) wind turbines to improve the rotor standard deviation of the wind turbines under normal and extreme wind conditions. The pitch H-infinity control algorithm only uses H-infinity control in the blade pitch control loop in the rated power region, and conventional torque gain scheduling algorithms are applied in the partial power region. The performance of this controller was verified using simulations of a 5 MW wind turbine using the commercial aeroelastic simulation code Bladed. The performance of the pitch H-infinity controller was compared with that of the conventional proportional-integral (PI) control algorithm under three different operating conditions: normal operating conditions without sensor noise, normal operating conditions with sensor noise, and extreme operating conditions without sensor noise based on the wind turbine design standard by IEC. Based on the simulation results with two different wind speed regions, namely, the transition region and the rated power region, it was found that the proposed pitch H-infinity controller showed better rotor speed standard deviation performance in the three operating conditions and achieved lower standard deviations of the rotor speed and the electrical power without affecting the mean electrical power.
It is important to estimate the energy required in ore processing to select the most affordable and efficient energy system for the integration of renewable resources into the mining industry. In the present work, the energy consumption for the concentrate of tungsten ore in Mongolia was theoretically predicted based on operational variations (particle size and the hardness of the tungsten ore) and different equipment. The energy was in the range from 0.48 to 1.32 kWh/t for the crushing stage, and a cone crusher was more suitable than a jaw crusher due to the particle size of feed material and product. The required energy in the grinding stage was from 6.22 to 11.88 kWh/t using a SAG mill or from 3.04 to 7.39 kWh/t using a ball mill. The further separation by a flotation consumed 4.83 kWh/t or by a shaking table consumed 1.29 kWh/t. The maximum energy consumption per hour for the whole process was estimated to be 2–3 MW, which was better to integrate with a hybrid renewable energy system. The sizing method Power Pinch Analysis was used to estimate the electric supply based on the combination of wind, biomass and solar resources, which was sufficient for the demand from the predicted range of energy.
This paper presents possibilities to implement a capacity market in the Mongolian energy system and analyses long term planning with different plants. Covering rapid increasing electric demand requires a complex solution in the energy system, which should support not only for the customer and stakeholders. Proposed capacity market model for energy system in Mongolia, considering existing and new entrants of generation plants.
Adopting and widely implementing solar photovoltaic (PV) systems are regarded as a promising solution to address energy crises by providing a sustainable and independent electricity supply while significantly reducing greenhouse gas emissions to combat climate change. This encourages households, organizations, and enterprises to install solar PV systems. However, there are many solar PV systems that have been connected to the power distribution grid without following the required procedures. Power distribution grid operators cannot detect the locations of these solar PV systems. Thus, it is necessary to assess the impact of solar PV systems on the power distribution grid in detail, even though there are multiple economic and environmental advantages associated with installing solar PV systems. This study analyzes the changes in an overloaded power distribution grid’s power losses and voltage deviations with solar PV systems. There are two main factors considered for assessing the impact of the solar PV system on the power distribution grid: the total installed capacity of the solar PV systems and the location of the connection. Based on a comparison between the measurement results of three feeders with higher loads in the Ulaanbaatar area, the Dambadarjaa feeder, which has the highest load, was selected. The impact of the solar PV systems on the selected feeder was analyzed by connecting eight solar PV systems at four different locations. Their total installed capacities vary between 25 and 80 percent of the highest daily load of the selected feeder. The results show that the power loss of the feeder can be greatly reduced when the total installed capacity of the solar PV systems is selected optimally, and the location of the connection is at the end of the power distribution grid.
This paper suggests the Li-Battery fast charge system based on DC link. That is composed of 3phase PWM converter, PV boost converter and isolated full-bridge converter. This paper studies power control scheme of the entire system and how the rapid charging of the battery. The proposed system is supplied the power from not only grid by current control of the 3phase PWM converter but also MPPT(Maximum Power Point Tracking) control of PV system, and rapidly charge the Li-battery by CVCC method (constant voltage/constant current) of the isolated full bridge converter.