Jing Gao

Dr. Jing Gao


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 February 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
JGJing Gao
Jing Gao
WZWeibo Zhou
Weibo Zhou
SLShuwu Li
Shuwu Li
CLChanghu Li
Changhu Li
QWQun Wang
Qun Wang
KWKun Wang
Kun Wang
Groundwater assessment has several technical deficiencies, especially because the decision-making platform for basic data collection, analysis, and evaluation has not been established. Based on the computer architecture theory and business processing logic, we designed a set of groundwater resource overload evaluation systems using the ArcGIS platform and Python language based on the comprehensive analysis of many research schemes. According to the pressure–state–response (PSR) theoretical programming model, the system pre-sets the evaluation index from three aspects: overexploitation, bearing capacity, and overload. The entropy weight method was used to determine the factor weight. The system was used to evaluate and analyze the groundwater overload in Xi’an, and the performance and accuracy of the system were also verified. The results showed that the serious overload area of groundwater in Xi’an was located in the alluvial fan area of Yanliang District, Gaoling District, and Huyi District, and the alluvial fan area of Lintong District, City Six Districts, and Zhouzhi County. The general overload area was located in the alluvial plain area of City Six Districts, Chang’an District, the flood plain and the first terrace of Huyi District, the loess tableland area of Zhouzhi County, and the alluvial fan area of Lantian County. The remaining areas were not overloaded. The evaluation results matched the study, which confirmed that the evaluation system was stable and that the results were reliable.

31 August 2023 in Bangladesh Journal of Botany
Verified
Journal Article
Open access
PDF file
JGJing Gao
Jing Gao
SLShuwu Li
Shuwu Li
CLChanghu Li
Changhu Li
ZLZhengzheng Li
Zhengzheng Li
XAXiaofan An
Xiaofan An
TZTingyu Zhang
Tingyu Zhang
The initial geological analysis of hydropower projects is greatly complicated by the existence of complex geological conditions. To adapt advances in informatization and digitalization to the needs of the engineering survey industry and to conduct geological analysis more intuitively, in the present study the development of “GeoBIM”, a geological 3D design platform based on the DSI modeling engine and a “graphics + data” architecture is rerported. GeoBIM realized the integration of 3D information in the whole process of geological work, from field data collection, model design, and analysis to approval. Taking the siting and construction of a hydropower station as an example, the field data collection and cataloging APP (boreholes, caverns, slopes) and web-side exploration monitoring platform of GeoBIM were used to build a 3D geological fine visualization model. The principle of dissipated energy was used to analyze the quality of the rock mass, which showed the spatial distribution characteristics of local geological conditions and rock mass quality, improving the efficiency and intuitiveness of engineering rock mass quality classification. GeoBIM was compared with traditional 2D geological analysis methods and actual conditions to demonstrate the rationale and intuitive use of the 3D digital evaluation method in geological engineering. Bangladesh J. Bot. 52(2): 679-688, 2023 (June) Special