Wenxi Ren

Dr. Wenxi Ren

State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University, Chengdu 610500, China

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 March 2017 in Industrial & Engineering Chemistry Research
Verified
Journal Article
Closed access
Wenxi RenWenxi Ren
Wenxi Ren
GLGensheng Li
Gensheng Li
STShouceng Tian
Shouceng Tian
MSMao Sheng
Mao Sheng
LGLidong Geng
Lidong Geng

26 June 2019 in Energy & Fuels
Verified
Journal Article
Closed access
Wenxi RenWenxi Ren
Wenxi Ren
JGJianchun Guo
Jianchun Guo
FZFanhui Zeng
Fanhui Zeng
TWTianyu Wang
Tianyu Wang

17 December 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
TWTianyu Wang
Tianyu Wang
QWQisheng Wang
Qisheng Wang
JSJing Shi
Jing Shi
WZWenhong Zhang
Wenhong Zhang
Wenxi RenWenxi Ren
Wenxi Ren
STShouceng Tian
Shouceng Tian
Predicting shale gas production under different geological and fracturing conditions in the fractured shale gas reservoirs is the foundation of optimizing the fracturing parameters, which is crucial to effectively exploit shale gas. We present a multi-layer perceptron (MLP) network and a long short-term memory (LSTM) network to predict shale gas production, both of which can quickly and accurately forecast gas production. The prediction performances of the networks are comprehensively evaluated and compared. The results show that the MLP network can predict shale gas production by geological and fracturing reservoir parameters. The average relative error of the MLP neural network is 2.85%, and the maximum relative error is 12.9%, which can meet the demand of engineering shale gas productivity prediction. The LSTM network can predict shale gas production through historical production under the constraints of geological and fracturing reservoir parameters. The average relative error of the LSTM neural network is 0.68%, and the maximum relative error is 3.08%, which can reliably predict shale gas production. There is a slight deviation between the predicted results of the MLP model and the true values in the first 10 days. This is because the daily production decreases rapidly during the early production stage, and the production data change greatly. The largest relative errors of LSTM in this work on the 10th, 100th, and 1000th day are 0.95%, 0.73%, and 1.85%, respectively, which are far lower than the relative errors of the MLP predictions. The research results can provide a fast and effective mean for shale gas productivity prediction.

16 December 2020 in Energy & Fuels
Verified
Journal Article
Closed access
TWTianyu Wang
Tianyu Wang
STShouceng Tian
Shouceng Tian
WZWenhong Zhang
Wenhong Zhang
Wenxi RenWenxi Ren
Wenxi Ren
GLGensheng Li
Gensheng Li

13 May 2020 in Energy & Fuels
Verified
Journal Article
Closed access
FZFanhui Zeng
Fanhui Zeng
YZYu Zhang
Yu Zhang
JGJianchun Guo
Jianchun Guo
Wenxi RenWenxi Ren
Wenxi Ren
QJQifeng Jiang
Qifeng Jiang
JXJianghua Xiang
Jianghua Xiang

18 August 2025 in Energy & Fuels
Verified
Journal Article
Closed access
Wenxi RenWenxi Ren
Wenxi Ren