Multistage hydraulic fracturing is one of the most prevalent approaches for shale reservoir development. Due to the complexity of constructing reservoir environments for experiments, numerical simulation is a vital method to study flow behavior under reservoir conditions. In this paper, we propose a numerical model that considers a multistage fractured horizontal well with a hilly-terrain trajectory in a shale reservoir with the presence of natural fractures. The model was constructed based on the MATLAB Reservoir Simulation Toolbox and used the Embedded Discrete Fractured Model (EDFM) to describe the interrelationship between the matrix, fractures, and wellbore. The model was then applied to an actual condensate gas well producing from a shale reservoir, and the effects of reservoir parameters on the simulation data were studied based on this well case. The simulation results were highly consistent with the actual production data, which validates the accuracy of this model and proves its potential for predicting future production trends. We extended the discussion to two examples with extreme well trajectories by reviewing the inflow contribution of each hydraulic fracture with respect to fracture pressure, and the changes in static pressure with time. In conclusion, the proposed model is capable of providing simulation results close to reality and thus guiding field design and operation in the fracturing and drilling process.
The Fuling shale gas field is facing a rapid gas production decline due to heavy liquid loading issues. Given the condition that most wells are located at remote areas in the mountains, the traditional gas lift methods that require either fixed compressor or skid-mounted gas lift trucks do not seem feasible and occur high operation costs. A new type of gas lift valve that can be opened or closed at a low valve dome pressure indicates the high sensitivity to low production pressure. Thus, the piping line pressure can be utilized to activate the valve due to its new advantages. In addition, the specially designed structure of the gas lift valve can be activated via pressure increases in the tubing to create a channel between the tubing and annulus. The valve that previously functioned as a dummy valve was then switched to a gas lift valve. Field application results show that all wells were successfully restarted by only utilizing the low piping pressure, and loaded liquid was lifted with gas production at an incremental rate that reached up to 27.4 × 10 kscm/d per well. Fewer slickline operations were conducted to replace the dummy valve. The result of the application shows that the new type of gas lift system has a wide range of application prospect for low pressure wells, especially for shale gas wells.