Athanasios Chassiakos

Dr. Athanasios Chassiakos

Department of Civil Engineering, University of Patras, 26504 Rio, Greece
orcid

Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2005 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Athanasios ChassiakosAthanasios Chassiakos
Athanasios Chassiakos
SSSerafim P. Sakellaropoulos
Serafim P. Sakellaropoulos
Time-cost analysis is an important element of project scheduling, especially for lengthy and costly construction projects, as it evaluates alternative schedules and establishes an optimum one considering any project completion deadline. Existing methods for time-cost analysis have not adequately considered typical activity and project characteristics, such as generalized precedence relationships between activities, external time constraints, activity planning constraints, and bonuses/penalties for early/delayed project completion that would provide a more realistic representation of actual construction projects. The present work aims to incorporate such characteristics in the analysis and has developed two solution methods, an exact and an approximate one. The exact method utilizes a linear/integer programming model to provide the optimal project time-cost curve and the minimum cost schedule considering all activity time-cost alternatives together. The approximate method performs a progressive project length reduction providing a near-optimal project time-cost curve but it is faster than the exact method as it examines only certain activities at each stage. In addition, it can be easily incorporated in project scheduling software. Evaluation results indicate that both methods can effectively simulate the structure of construction projects, and their application is expected to provide time and cost savings.

13 April 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
VLVasiliki Lazari
Vasiliki Lazari
Athanasios ChassiakosAthanasios Chassiakos
Athanasios Chassiakos
The incorporation of electric vehicles into the transportation system is imperative in order to mitigate the environmental impact of fossil fuel use. This requires establishing methods for deploying the charging infrastructure in an optimal way. In this paper, an optimization model is developed to identify both the number of stations to be deployed and their respective locations that minimize the total cost by utilizing Genetic Algorithms. This is implemented by combining these components into a linear objective function aiming to minimize the overall cost of deploying the charging network and maximize service quality to users by minimizing the average travel distance between demand spots and stations. Several numerical and practical considerations have been analyzed to provide an in-depth study and a deeper understanding of the model’s capabilities. The optimization is done through commercial software that is appropriately parametrized to adjust to the specific problem. The model is simple yet effective in solving a variety of problem structures, optimization goals and constraints. Further, the quality of the solution seems to be marginally affected by the shape and size of the problem area, as well as the number of demand spots, and this may be considered one of the strengths of the algorithm. The model responds expectedly to variations in the charging demand levels and can effectively run at different levels of grid discretization.

20 December 2017 in Organization, Technology and Management in Construction: an International Journal
Verified
Journal Article
Open access
PDF file
PFPanagiotis M. Farmakis
Panagiotis M. Farmakis
Athanasios ChassiakosAthanasios Chassiakos
Athanasios Chassiakos
The dynamic construction site layout planning (DCSLP) problem refers to the efficient placement and relocation of temporary construction facilities within a dynamically changing construction site environment considering the characteristics of facilities and work interrelationships, the shape and topography of the construction site, and the time-varying project needs. A multi-objective dynamic optimization model is developed for this problem that considers construction and relocation costs of facilities, transportation costs of resources moving from one facility to another or to workplaces, as well as safety and environmental considerations resulting from facilities’ operations and interconnections. The latter considerations are taken into account in the form of preferences or constraints regarding the proximity or remoteness of particular facilities to other facilities or work areas. The analysis of multiple project phases and the dynamic facility relocation from phase to phase highly increases the problem size, which, even in its static form, falls within the NP (for Nondeterministic Polynomial time)- hard class of combinatorial optimization problems. For this reason, a genetic algorithm has been implemented for the solution due to its capability to robustly search within a large solution space. Several case studies and operational scenarios have been implemented through the Palisade’s Evolver software for model testing and evaluation. The results indi­cate satisfactory model response to time-varying input data in terms of solution quality and computation time. The model can provide decision support to site managers, allowing them to examine alternative scenarios and fine-tune optimal solutions according to their experience by introducing desirable preferences or constraints in the decision process.

18 September 2020 in Systems
Verified
Journal Article
Open access
PDF file
SKStylianos Karatzas
Stylianos Karatzas
Athanasios ChassiakosAthanasios Chassiakos
Athanasios Chassiakos
Inelasticity of demand along with the distributed energy sources and energy market democratization pose significant challenges which have considerable negative impacts on overall grid balance. The need for increased capacity and flexibility in the era of energy market digitalization has introduced new requirements in the energy supply network which could not be satisfied without continuous and costly local power network upgrades. Additionally, with the emergence of Smart Homes (SHs) and Home Energy Management (HEM) systems for monitoring and operating household appliances, opportunities have arisen for automated Demand Response (DR). DR is exploited for the modification of the consumer energy demand, in response to the specific conditions within the electricity system (e.g., peak period network congestion). In order to optimally integrate DR in the broader Smart Grid (SG) system, modelling of the system parameters and safety analysis is required. In this paper, the implementation of STPA (System-Theoretic Process Analysis) structured method, as a relatively new hazard analysis technique for complex systems is presented and the feasibility of STPA implementation for loss prevention on a Demand Response system for home energy management, and within the complex SG context, is examined. The applied method delivers a mechanism useful in understanding where gaps in current operational risk structures may exist. The STPA findings in terms of loss scenarios can be used to generate a variety of safeguards to ensure secure operational control and in implementing targeted strategies through standard approaches of risk assessment.

1 January 2017 in Procedia Engineering
Verified
Journal Article
Open access
PFPanagiotis M. Farmakis
Panagiotis M. Farmakis
Athanasios ChassiakosAthanasios Chassiakos
Athanasios Chassiakos

10 August 2024 in Algorithms
Verified
Journal Article
Open access
PDF file
VLVasiliki Lazari
Vasiliki Lazari
Athanasios ChassiakosAthanasios Chassiakos
Athanasios Chassiakos
Stylianos KaratzasStylianos Karatzas
Stylianos Karatzas
Effective resource management constitutes a cornerstone of construction project success. This is a challenging combinatorial optimization problem with multiple and contradictory objectives whose complexity rises disproportionally with the project size and special characteristics (e.g., repetitive projects). While relevant work exists, there is still a need for thorough modeling of the practical implications of non-optimal decisions. This study proposes a multi-objective model, which can realistically represent the actual loss from not meeting the resource utilization priorities and constraints of a given project, including parameters that assess the cost of exceeding the daily resource availability, the cost of moving resources in and out of the worksite, and the cost of delaying the project completion. Optimization is performed using Genetic Algorithms, with problem setups organized in a spreadsheet format for enhanced readability and the solving is conducted via commercial software. A case study consisting of 16 repetitive projects, totaling 160 activities, tested under different objective and constraint scenarios is used to evaluate the algorithm effectiveness in different project management priorities. The main study conclusions emphasize the importance of conducting multiple analyses for effective decision-making, the increasing necessity for formal optimization as a project’s size and complexity increase, and the significant support that formal optimization provides in customizing resource allocation decisions in construction projects.