Seojin MOON

Mr. Seojin MOON


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 May 2023 in Drones
Verified
Journal Article
Open access
PDF file
MSeojin MOON
Seojin MOON
Jongho OckJongho Ock
Jongho Ock
Both drones and laser scanners digitally take the as-built context of an object into the computer, and the data taken are transmitted to a Building Information Modeling (BIM) world to create accurate 3D models. Although the laser scanner is the leading method of the Scan-to-BIM procedure, many professionals indicate drawbacks of the technology and point out the drone is an alternative that can improve the shortcomings, leading to the UAV-to-BIM process. The Korean construction industry plans to implement drone technology for scrutinizing as-built construction quality by 2025. However, drones are not popular in construction projects. Korean universities where Construction Engineering and Management programs have been implemented have requested to develop a drone curriculum for construction professionals. Since the majority of the professionals are not familiar with drone operation, in order for the schools to be successful in developing the curriculum, it is very necessary to perform a preliminary experimental study for identifying the essential education contents that are appropriate for drone beginners. The main objective of this paper is to perform a study for drone beginners and recognize the recommendations and the framework of a drone curriculum that will be beneficial for the schools to develop a comprehensive curriculum later on.

27 April 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
MSeojin MOON
Seojin MOON
Jongho OckJongho Ock
Jongho Ock
Both drones and laser scanners digitally take the as-built context of an object into the computer and the data taken is transmitted to a Building Information Modeling (BIM) world to create ac-curate 3D models. Although the laser scanner is the leading method of the Scan-to-BIM proce-dure, many professionals indicate drawbacks of the technology and point out the drone is an al-ternative that can improve the shortcomings, leading to the UAV-to-BIM process. Korean con-struction industry plans to implement the drone technology for scrutinizing as-built construc-tion quality by 2025. However, the drone is not popular in the construction projects. Korean universities where Construction Engineering and Management program have been implement-ed are requested to develop a drone curriculum for construction professionals. Since the majori-ty of the professionals are not familiar with drone operation, in order for the schools to be suc-cessful in developing the curriculum, it is very necessary to perform a preliminary experimental study for identifying the essential education contents that are appropriate to drone beginners. The main objective of this paper is to perform the study for the drone beginners and recognize the recommendations and the framework of drone curriculum that will be beneficial for the schools to develop a comprehensive curriculum later on.

24 January 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
MSeojin MOON
Seojin MOON
Jongho OckJongho Ock
Jongho Ock
A drone performs comparable function to a laser scanner in the construction quality monitoring, following Scan-to-BIM process. Both technologies digitally capture the as-is environment into the computer and the data captured is transferred to a BIM world to create accurate as-built models. Although the laser scanner is the dominant method of the Scan-to-BIM process, a number of digital professionals point drawbacks of the method and present the drone is an alternative that can improve the drawbacks thereby leading to UAV-to-BIM process in parallel with the Scan-to-BIM. Korean construction industry plans to utilize the two technologies for monitoring construction operation quality in major public projects by 2025. While contractors need competent engineers to be competitive in the projects, the two technology applications are not so popular to the construction projects in Korea and very few experts skillful and knowledgeable of the technologies are available. Korean universities are requested to develop the curriculum of the technologies for the contractors. To be successful in progressing the curriculum, it is very essential to implement a preliminary study with the technologies minimizing the potential failure in operating the curriculum later on. This study performs empirical research on the technologies and identify valuable lessons beneficial to develop the UAV-to-BIM curriculum for the construction engineers.