Mohammed Taha Alqershy

Dr. Mohammed Taha Alqershy


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 June 2023 in Buildings
Verified
Journal Article
Open access
PDF file
MAMohammed Alqershy
Mohammed Alqershy
QSQian Shi
Qian Shi
Social responsibility strategies are indispensable for the sustainable development of the Belt and Road Initiative (BRI). Nonetheless, the application of social responsibility (SR) policies in such mega infrastructure projects remains a pressing concern since a number of barriers impede the effective integration of SR practices. Therefore, this paper seeks to identify these barriers and determine the interrelationships among them. A list of barriers was first identified from a literature review and expert consultation. Subsequently, a survey was designed to collect experts’ views on the interrelations among these barriers. The Fuzzy DEMATEL method was employed to analyze these barriers’ causal relationships and interdependencies. Subsequently, the ISM approach was used to develop a hierarchical structure and establish the driving and dependence relationships among them. The classification of barriers, based on driving power and dependence power, was accomplished using the MICMAC analysis. The results reveal that barriers such as “The diverse institutions, cultures, and social conditions among BRI countries”, “Lack of robust social responsibility laws and regulations in the host countries”, “Lack of stringent and legally binding BRI policies and guidelines governing social responsibility”, “The diverse environmental and social frameworks and standards among BRI countries”, “The diverse international, national, and private funds for BRI projects”, and “Lack of customer awareness and knowledge of CSR” are the most critical barriers and have the greatest influence on social responsibility implementation. Identifying these key barriers and their interrelationships will assist decision-makers, policymakers, and other stakeholders involved in BRI mega infrastructure projects in minimizing or overcoming them, hence increasing the chances of successfully integrating social responsibility practices within these projects.

15 March 2024 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
MAMohammed Alqershy
Mohammed Alqershy
QSQian Shi
Qian Shi
DADiana R. Anbar
Diana R. Anbar
Purpose: This study aims to investigate the factors influencing the social responsibility performance of Belt and Road Initiative (BRI) megaprojects. Specifically, it examines the role of isomorphic pressures and the joint influence of perceived benefits and top management support on megaproject social responsibility performance (MSRP). Design/methodology/approach: Drawing from institutional theory, social exchange theory, and top management literature, this study established a conceptual model featuring eleven hypotheses. Subsequently, a questionnaire survey was administered to collect data from 238 actively engaged participants in BRI megaprojects. Structural Equation Modelling was utilised to analyse the data. Findings: The empirical findings indicate that mimetic and coercive pressures positively influence MSRP. Perceived benefits and top management support significantly enhance MSRP. Moreover, perceived benefits and top management support partially mediate the effects of coercive and mimetic pressures. However, when it comes to normative pressures, their impact on MSRP is solely channelled through the support of top management. Originality/value: This study is one of the early endeavours to explore the factors influencing the social responsibility performance of BRI megaprojects. It sheds light on the interplay between external pressures and internal factors in shaping social responsibility efforts in these projects. These findings are of particular significance for BRI actors and stakeholders, offering guidance for enhancing social responsibility strategies within the context of BRI megaprojects.

11 August 2021 in International Journal of Construction Management
Verified
Journal Article
Closed access
MAMohammed Alqershy
Mohammed Alqershy
RKRavande Kishore
Ravande Kishore
Claims are a major concern in every construction project. With the increasing complexity and size of the construction projects in India, the number and frequency of claims, also bound to increase, which adversely affects the construction environment. So, an early prediction of these claims is crucial to avoid their costly negative impacts. This paper aimed to develop artificial neural network models to predict the frequency of claims in construction projects. Based on a comprehensive literature review, a total of 39 factors causing claims were identified first, and then refined by Delphi interview with 10 experts. Subsequently, a questionnaire was further developed and disseminated to different owners, contractors, and consultants’ organizations working in the Indian construction sector, which received 206 valid replies. The questionnaire data were then utilized to develop and validate the construction claims frequency prediction models. For this, an artificial neural network approach was used to construct the models. These models will help the construction professionals in predicting the frequency of occurrence for different types of claims throughout the course of the project and enable them to select the best strategy available to avoid or mitigate their occurrence at an early stage.

3 July 2024 in Engineering Management Journal
Verified
Journal Article
Closed access
MAMohammed Alqershy
Mohammed Alqershy
QSQian Shi
Qian Shi
FZFeng Zhang
Feng Zhang

26 April 2018 in Civil Engineering Research Journal
Verified
Journal Article
Open access
MAMohammed Alqershy
Mohammed Alqershy
The Civil Engineering Research Journal is an open access, international online publishing engineering journal. This journal publishes top-level work on Civil Engineering.

21 November 2024 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
DADiana R. Anbar
Diana R. Anbar
TCTengyuan Chang
Tengyuan Chang
Safi UllahSafi Ullah
Safi Ullah
MAMohammed Alqershy
Mohammed Alqershy
KMKawther Mousa
Kawther Mousa
XDXiaopeng Deng
Xiaopeng Deng
Purpose: This study explores the factors influencing knowledge hiding (KH) in international construction projects (ICPs), focussing on the role of ethnic minorities (EMs) and interpersonal distrust (ID). It also aims to understand how these factors influence KH and explore the mediating effect of ID on the relationship between EMs and KH. Design/methodology/approach: A survey questionnaire was developed and distributed to professionals participating in ICPs. We used structural equation modelling (SEM) to analyse 294 valid responses, examining the effect of EMs, ID and demographic variables on KH behaviours. Our approach integrates insights from social identity theory (SIT) and actor network theory (ANT) to provide a comprehensive framework for understanding the observed dynamics. Findings: The findings reveal that EMs significantly influence KH behaviours, with ID partially mediating this relationship. Additionally, demographic variables such as gender and age also play significant roles in KH behaviours. However, the degree of education did not show a significant impact on KH. Our results emphasise the critical importance of addressing ID and fostering inclusive environments to reduce KH. Research limitations/implications: While our study sheds light on the complex dynamics of KH in ICPs, further research could explore additional contextual factors and organisational influences. While our study emphasises the importance of inclusive practices and trust-building to mitigate KH, it also recognises the need for a deeper understanding of power dynamics and organisational contexts. Practical implications: Our findings underscore the importance of creating transparent and inclusive cultures of knowledge sharing (KS). Implementing inclusion initiatives and providing cultural awareness training can enhance project outcomes and organisational success. We also propose a practical framework to mitigate KH by promoting trust, inclusivity and effective KS practices. Originality/value: This study contributes to the understanding of knowledge management in multicultural project teams by integrating SIT and ANT, offering a comprehensive perspective on the factors driving KH in ICPs. The findings pave the way for future investigations into power dynamics and organisational contexts within ICPs.