There is a necessity to assess water resources sustainability for its development and management. However, achievements in water resources and sustainability assessment and specific assessment indicators are limited in current research. A comprehensive index system and the importance priorities of indicators are provided in this study. The group AHP-PCA (group analytic hierarchy process and principal component analysis) method is proposed to calculate the importance priorities and reduce the dispersion existing in traditional group AHP. A case study is conducted to assess the water resource sustainability of four provinces where the Jinsha River flows and the results are consistent with the experience and knowledge of water resources management and actual situations of these provinces. Further work is still needed for more applications.
13 September 2022 in Reliability Engineering & System Safety
There are many types of accidents with their own characteristics in hydropower construction. The accidents are mainly results of human errors. It is important to find out the routes to failure and give recommendations pertinently for different accident types. First, 869 accident investigation reports are collected and the human factors are filtered using the Human Factors Analysis and Classification System (HFACS) framework, the norms which link the accident causes and human factors are also explored, the first three accident types are determined by the frequency statistics. The ranking of the factors and the norms of the three accident types is presented using the frequency statistics. The Chi-square, lambda and odds ratios are used to analyze the interdependences between adjacent level factors of three highest frequency accident types. At last, based on the correlation analysis between different human factors, the routes to failure can be determined; containing the norm frequency of factors, the safety recommendations are given to the different accident types pertinently. The results can be auxiliary and effective information for safety managers to conduct scientific and pertinent safety managements.
7 February 2024 in Advanced Engineering Informatics