Les Ruddock

Prof. Dr. Les Ruddock


Research Focus & Metrics

Academic Career Length

41Years (1986-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2006 in Construction Management and Economics
Verified
Journal Article
Closed access
LRLes Ruddock
Les Ruddock
JLJorge Lopes
Jorge Lopes
The complexities of the relationship between a country's level of construction activity and its stage of economic development are considerable. Studies over the last three decades, based on macroeconomic analysis, have attempted to model the relationship but have usually been hampered by problems of data quality and availability. Nevertheless, paradigms have emerged (usually based on Keynesian philosophy), which are concerned with the dynamics of construction activity as an agent in the promotion of economic growth in economies at different stages of development. One such is the ‘Bon curve’. An examination of the data issues of attempting to assess the validity of the proposition is made and then the role of the construction sector in highly developed economies is considered.

1 May 2002 in Building Research & Information
Verified
Journal Article
Closed access
JLJorge Lopes
Jorge Lopes
LRLes Ruddock
Les Ruddock
FRFrancisco Loforte Ribeiro
Francisco Loforte Ribeiro

1 October 2002 in Construction Management and Economics
Verified
Journal Article
Closed access
LRLes Ruddock
Les Ruddock
In the context of a truly global market for construction, an international strategy is required to ensure that national and international statistical systems are able to provide accurate and valid information. In many parts of the world the collection of reliable national information on construction activity is not an easy task, and the measurement of comparable, cross-national data can be problematic. This paper considers possible strategies for the improvement of data collection systems in the context of user needs.

5 July 2013 in Structural Survey
Verified
Journal Article
Closed access
William SwanWilliam Swan
William Swan
LRLes Ruddock
Les Ruddock
LSLuke Smith
Luke Smith
RFRichard Fitton
Richard Fitton
Purpose: The study was designed to assess the knowledge, adoption and perceived effectiveness of sustainable retrofit technologies within the UK social housing sector.Design/methodology/approach: The study was undertaken using a structured questionnaire that was completed by 130 providers of social housing.Findings: The study showed that social housing providers were evenly split in their reliance on internal or external information for sustainable retrofit knowledge. In terms of adoption identified that this was strongly driven by government‐funded programmes, leading to widespread adoption of low technology solutions. The respondents identified that many leading edge technologies were perceived to be less effective.Research limitations/implications: The study represents a snap‐shot of adoption and effectiveness issues, therefore does not show the trajectory of adoption which should be addressed in a follow‐up study.Practical implications: The social housing sector has been viewed as a market maker for some of the newer technologies. It indicates that some of the newer technologies, such as heat pumps are viewed as less effective than more established technologies.Social implications: The study has implications for the adoption of technology to address fuel poverty and climate change, as well as informing future policy such as Green Deal.Originality/value: The study includes 130 responses from the social housing stock and gives a perspective of current views on adoption and effectiveness of retrofit technologies within the social housing sector. This is useful for both other social housing providers and policy makers.

21 December 2011 in Construction Management and Economics
Verified
Journal Article
Closed access
LRLes Ruddock
Les Ruddock
SRSteven Ruddock
Steven Ruddock
For an assessment of the productivity performance of construction at the industry level, the quality of any analysis can be improved by the availability and use of detailed data on the basic components of the industry’s production function. The EU KLEMS Growth and Productivity Accounts comprise a dataset that provides a rich source of information on the sources of growth by industry, one of which is the construction industry (ISIC 45), since the 1970s for European Union countries and other major economies. The database allows a breakdown of factor inputs by the categorization of capital inputs into asset types and labour inputs into components such as skill levels to provide more precise measurement of sources of growth at industry level. The UK construction sector forms the focal point of the analysis and the results of this analysis provide evidence of a steady increase in the growth of ICT and improved labour skills usage and a relatively high rate of total factor productivity for the UK construction industry.

31 March 2006 in International Journal of Strategic Property Management
Verified
Journal Article
Open access
PDF file
LRLes Ruddock
Les Ruddock
Any assessment of the extent of the economic benefits for the construction sector from technological change is difficult to determine accurately but in view of the construction sector's contribution to a nation's economy, it is important that the impact of technological change on the industry is properly recognised. One area of technological change in the industry — the increased use of information and communication technology (ICT) is considered in this study, which examines the evidence concerning the crucial role of ICT usage and investment in generating growth and improving technical productivity in the industry and considers the question of how the gains from ICT can be evaluated at the industry level. The U.K. construction sector forms the focal point of this study but comparisons are also made with the construction sectors of other industrially developed countries. The results of the analysis find that the construction industry is now beginning to reap the benefits on productivity from the post ‐ 1995 surge in ICT investment.