A laboratory investigation was carried out to determine the optimum soil to fly ash mix ratio to enhance the engineering properties of clayey sand that can potentially be used as a road subgrade. Grain size distribution and Atterberg limits tests were conducted to classify the soil and to study the effects of the fly ash on the soil plasticity. The Proctor test was conducted to determine the optimum moisture content and maximum dry density of soil-fly-ash mixtures with arbitrarily selected 0%, 40%, 50%, and 60% fly ash content. A higher percentage was selected to find the highest optimum fly ash content to maximize the beneficial use. Unconfined compression and consolidation tests were conducted with air-dry arbitrarily selected curing periods of 0, 2, 8, and 28 days to determine the strength and to predict the settlement and the volume change behavior. It can be concluded from the trend analysis that a fly ash content range of 32–50% appeared to be optimum that is expected to perform better as subgrade materials for a curing period range of 16–19 days. However, experimental data showed a fly ash content of 50% was the optimum for a curing period of 8 days. The settlement and the volume change behavior improved at least 44% with increased fly ash content.
Large-span post-tensioned (PT) beams play a crucial role in maximizing the benefits of post-tensioning techniques. Bonded and unbonded systems are prevalent, with the latter being more widespread in the United States. While bonded systems are advantageous for creating long spans when multiple tendons are grouped in ducts, limited literature exists on their demolition. In a case study, this paper addresses the unique challenge of demolishing large-span bonded post-tensioned beams due to a building's functional change. Emphasizing insights for engineers, it explores the use of cutting and dismantling methods, considering the presence of prestressed cables. The demolition process is distinctive due to the presence of numerous pre-stressed cables along the beams, necessitating a specialized and cautious cutting approach. This is accomplished through the use of a drilling technique that selectively distresses the tendons, ensuring they are not all affected simultaneously. An intriguing observation discussed in this paper pertains to the occurrence of horizontal cracks accompanied by loud sounds following the drilling process, offering insights from the design perspective of PT systems. The paper details an innovative method for safely demolishing large-span bonded PT beams, using ground-penetrating radar and computer models to navigate structural complexities and ensure nearby structures' safety.
Large-span, post-tensioned (PT) beams play a crucial role in maximizing the benefits of post-tensioning techniques. Bonded and unbonded systems are prevalent, with the latter being more widespread in the United States. While bonded systems are advantageous for creating long spans when multiple tendons are grouped in ducts, limited studies in the literature exist on their demolition. With a case study, this paper addresses the unique challenge of demolishing large-span-bonded, post-tensioned beams that occurs due to a building’s functional change. Emphasizing insights for engineers, it explores the use of cutting and dismantling methods, thereby considering the presence of prestressed cables. The demolition process is distinctive due to the presence of numerous prestressed cables along the beams, necessitating a specialized and cautious cutting approach. This is accomplished through the use of a drilling technique that selectively distresses the tendons, ensuring they are not all affected simultaneously. An intriguing observation discussed in this paper pertains to the occurrence of horizontal cracks accompanied by loud sounds following the drilling process, thereby offering insights from the design perspective of PT systems. This paper details an innovative method for safely demolishing large-span, bonded PT beams using ground-penetrating radar and computer models to navigate structural complexities and ensure nearby structures’ safety.