Purpose: Maintenance plans are programmes, which follow maintenance appraisals, contain information of what to do and the time approximates for accomplishments. They also deal with how to carry out maintenance jobs. In contemporary period, curiosity has proliferated about how sustainability affects manufacturing plans. The purpose of this paper is to offer a comprehensive notion of maintenance sustainability in maintenance planning. The literature has downplayed maintenance sustainability but may support in understanding how to crack the present company-community conflicts about the negative influence of manufacturing on the environment. Design/methodology/approach: This study develops the idea of selecting the proper maintenance strategy based on integrated fuzzy axiomatic design (FAD) principle and fuzzy-TOPSIS. This work suggests that the maintenance function is an uncertain, activity-oriented system. To fully appreciate the proposed framework, the work employs data from a cement manufacturing plant to test the structure. This study offers 20 influential factors on which it build the fundamental structure of maintenance system sustainability for manufacturing concerns. A novel literature contribution that departs from existing conceptions is the classical determination of weights of each sustainability factor, employing fuzzy entropy weighting approach. Furthermore, work innovatively determines the ranking of some important tenets of sustainability in maintenance and optimises the maintenance consumables employing the FAD principle. Findings: Interestingly, the output of the investigation revealed differences as the work adopts fuzzy-TOPSIS in comparison with FAD principle. Originality/value: Case examination of a real-life manufacturing venture validated the claims, showing maintenance workforce training as a top-echelon strategy for maintenance system sustainability.
9 November 2019 in International Journal of System Assurance Engineering and Management
Purpose: Key performance indicators (KPIs) of maintenance systems serve as benchmarks to workers and organizations to compare their goals for decision-making purposes. Unfortunately, the effects of one KPI on the other are least known, restraining decisions on prioritization of KPIs. This article examines and prioritizes the KPIs of the maintenance system in a food processing industry using the novel Taguchi (T) scheme-decision-making trial and evaluation laboratory (DEMATEL) method, Taguchi–Pareto (TP) scheme–DEMATEL method and the DEMATEL method.Design/methodology/approach: The causal association of maintenance process parameters (frequency of failure, downtime, MTTR, MTBF, availability and MTTF) was studied. Besides, the optimized maintenance parameters were infused into the DEMATEL method that translates the optimized values into cause and effect responses and keeping in view the result of analysis. Data collection was done from a food processing plant in Nigeria.Findings: The results indicated that downtime and availability have the most causal effects on other criteria when DEMATEL and T-DEMATEL methods were respectively applied to the problem. Furthermore, the frequency of failure is mostly affected by other criteria in the key performance indication selection using the two methods. The combined Taguchi scheme and DEMATEL method is appropriate to optimize and establish the causal relationships of factors.Originality/value: Hardly any studies have reported the joint optimization and causal relationship of maintenance system parameters. However, the current study achieves this goal using the T-DEMATEL, TP-DEMATEL and DEMATEL methods for the first time. The applied methods effectively ease decisions on prioritization of KPIs for enhancement.
15 December 2017 in Total Quality Management & Business Excellence
Total productive maintenance (TPM) is a Japanese concept, which aims to realise world-leading standard of performance in an efficient and effective maintenance environment. A fundamental pillar of TPM is the Kobetsu Kaizen (KK). This pillar is directed at controlling wastes and losses, while improving the overall equipment effectiveness. This study develops a multi-stage framework based on the KK pillar for production lines ranking. The first and second stages of the framework rank production lines using single and multiple factors, respectively. The third stage combined the stages one and two results to generate aggregate ranks for production lines. The fourth stage integrates Preference Ranking Organisation Method for Enrichment Evaluation and grey relational analysis methods outputs. The last stage uses the best-ranked production line as a benchmark to identify areas where other production lines need improvement. This work employs Step-wise Weight Assessment Ratio Analysis and Fuzzy TOPSIS (technique for order performance by similarity to ideal solution) as weighting and alternative solution methods, respectively. The proposed framework was tested using data from a cement plant. The results obtained show that the highest ranked production line was Production Line 1. Results show the potentials of performance enhancement of as a benchmarking tool for production systems.