1 March 2022 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
XGXinping Guo
Xinping Guo
AJAnnan Jiang
Annan Jiang
The Qingniwaqiao Station from Dalian’s 5th Metro Line in China has exhibited extremely complicated stratum structure, named as the upper soft lower hard (US-LH) stratum. In accordance with the characteristics of the stratum in which the station is located, the special structure form of double layer superimposed primary support arch cover method is presented. Numerical simulations and field monitoring are carried out to study the construction process. Subsequently, the double-layer primary lining, anchor and steel pipe pile are compared and analyzed respectively. The results show that the double-layer primary lining increases the safety reserve when the initial support is removed, and it can beneficially inhibit the deformation of the arch structure resulting in smaller ground surface subsidence. Anchor and steel pipe pile enhance the bearing capacity of rock mass on both sides of the station. The method has advantages in ground surface subsidence control and supporting structure safety. It is safe and feasible to create a large-span subway station using double layer superimposed primary support arch cover method in US-LH relative stratum.

5 January 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XLXiang Liu
Xiang Liu
AJAnnan Jiang
Annan Jiang
Qian FangQian Fang
Qian Fang
YWYousheng Wan
Yousheng Wan
JLJianye Li
Jianye Li
XGXinping Guo
Xinping Guo
In this paper, we study the effects of the shield tunnel construction on the deformation of an existing pipeline parallel to and above the new shield tunnel. We propose an analytical solution to predict the spatiotemporal deformation of the existing pipeline and consider different force patterns of the shield tunnelling, i.e., ground volume loss, support pressure, frictional force, and torsional force. The proposed method is validated by the monitoring data of Subway Line 3 of Nanchang and provides a reasonable estimation of the pipeline’s deformation. The parametric analyses are performed to study the influences on the pipeline’s deformation. The main advantage of our paper is that the spatiotemporal characteristics of the existing pipeline’s deformation are analysed, providing longitudinal deformation curve (LDC), deformation development curve (DDC), and grouting reinforcement curve (GRC). Compared with the perpendicular undercrossing project, both LDC and DDC have the same profiles and maximum values and move forward as a whole with the shield tunnel advance. Thus, the spatiotemporal deformation of the overall pipeline can be extrapolated from the deformation of two known points on the pipeline. The spatiotemporal characteristic curves combined with LDC, DDC, and GRC can suggest feasible, effective, and economical construction and grouting schemes to control the pipeline’s deformation after the deformation control standards have been determined.

20 October 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KRKuan Ren
Kuan Ren
AJAnnan Jiang
Annan Jiang
XGXinping Guo
Xinping Guo
QMQinghua Min
Qinghua Min
The section of Jialingjiang Road Station to Xiangjiang Road Station along Qingdao Metro Line 13 is located in Qingdao, China. All of them show obvious characteristics, being soft on the top and hard on the bottom, and the interval tunnel is faced with the problem of existing adjacent buildings. In order to ensure the smooth progress of construction, as well as minimize the damage to the buildings, a new mechanical excavation combined with a blasting construction scheme for the adjacent buildings is proposed. In this scheme, the step method is used for excavation. The upper step is in the weak stratum, and the mechanical method is therefore used for excavation; the lower step is in the hard stratum, and the drilling-and-blasting method is thus used for excavation. Using FLAC3D 5.0 finite difference software and the method based on blasting an equivalent load, the vibration velocity at adjacent buildings caused by the combined mechanical excavation and blasting scheme, as well as the traditional full-section blasting scheme, is compared and analyzed. Further, the construction parameters of the combined mechanical excavation and blasting scheme are compared and selected based on building settlement, the plastic zone of surrounding rocks, building vibration velocity and other factors. The results show that under the mechanical excavation blasting scheme, the peak particle velocity of each monitoring point decreases significantly compared with that under the full-section blasting scheme, with a maximum reduction of 61.1%, which is within the allowable range of the project, demonstrating the rationality of the new scheme. Finally, the mechanical excavation advance in the upper step is determined as 0.5 m. The optimized parameter construction effect is monitored and evaluated, the problems encountered in the project are successfully solved using the combined mechanical excavation and blasting scheme, and the expected construction period is shortened by 3 months, which shows the rationality of the blasting construction scheme proposed and its parameters, as well as the validity of the calculation results. The research results can be used as a reference for the construction scheme design of similar projects.


22 January 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
TZTao Zhan
Tao Zhan
XGXinping Guo
Xinping Guo
TJTengfei Jiang
Tengfei Jiang
AJAnnan Jiang
Annan Jiang
To realize parameter feedback optimization of tunnel construction in water-rich areas, a feedback analysis method for tunnel parameters under fluid–solid coupling conditions was established based on an intelligent optimization algorithm. Firstly, the numerical calculation model was established and solved using the fluid–solid coupling model. In orthogonal design analysis, the displacement of surrounding rock and pore water pressure distribution in different rock mass parameter combinations were obtained, and the learning samples needed for machine learning were established. The input group was surrounding rock displacement and pore water pressure, and the output was rock mass parameters. Then, the Gaussian process algorithm was used to obtain the nonlinear mapping relationship contained in the learning samples. A differential evolution algorithm was used to optimize the critical parameters involved in this process. Furthermore, according to the established regression model and the measured displacement and pore water pressure in the research area, differential evolution was used again to optimize the rock mass parameters and obtain the parameter feedback analysis results. Finally, the inversion values were compared with the actual measured values, and the reliability of the surrounding rock parameters obtained from the feedback analysis was verified, providing an effective method for obtaining surrounding rock parameters for similar projects.

30 June 2025 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
XGXinping Guo
Xinping Guo
YSYehua Song
Yehua Song
KRKuan Ren
Kuan Ren