The increasing interest in digital twin technology, the digitalization of worn-out social overhead capital (SOC), and disaster management services has augmented the usage of 3D spatial models and information to manage infrastructure. In this study, a digital twin of a subterranean utility tunnel was created, and spatial objects were identified using inbuilt image sensors. The novelty lies in the development of a unique algorithm that breaks down the structure of the utility tunnel into points, lines, and planes, identifying objects using a multimodal image sensor that incorporates light detection and ranging (LiDAR) technology. The three main conclusions of this study are the following: First, a digital twin of the utility tunnel was constructed using building information modeling integrated with a geographic information system (BIM-GIS). Second, a method for extracting spatial objects was defined. Third, image-sensor-based segmentation and a random sample consensus (RANSAC) were applied. In this process, the supplementary algorithm for extracting and updating 3D spatial objects was analyzed and improved. The developed algorithm was tested using point cloud data, showing easier object classification with more precise LiDAR data.
Digital twin technology can be used for disaster safety management of underground utility tunnels, which are social infrastructures. To verify its efficiency in an underground utility tunnel, it must be implemented and monitored in the real world. Therefore, the state of information about an object and the position of an object in the real world, which can change upon movement, should be correspondingly reflected in the digital model. Underground utility tunnels are monitored through closed circuit television (CCTV) cameras because the main infrastructure facilities are installed in a long and narrow form, which limits access to them. Therefore, synchronization of a digital twin model of an underground utility tunnel requires a method for identifying the location of an object through an installed CCTV camera. This study compares the DenseDepth transfer learning method and the coordinate system conversion method through floor plan projection to estimate depth using a single CCTV camera installed in an underground utility tunnel. The coordinate system conversion method through floor plane projection showed an error of 0.23 m to 1.5 m within a 50 m range. The DenseDepth transfer learning method showed an error of 1 m to 3 m; therefore, it was considered unsuitable for distance estimation. The coordinate system conversion method through floor plane projection showed a smaller error even at a longer distance than the DenseDepth transfer learning method. Therefore, the coordinate system conversion method through floor plane projection was considered more suitable than the DenseDepth transfer learning method for depth estimation using a single camera.
The growing complexity of urban environments and high-rise facilities presents new challenges for disaster preparedness and response, particularly when managing multiple hazards. Traditional systems that focus on single hazards are insufficient for complex facilities that are prone to cascading disasters. This study develops an open disaster information platform that integrates Building Information Modeling (BIM), Geographic Information Systems (GIS), and real-time monitoring tools to enhance situational awareness and multi-hazard response coordination. The platform combines data from the internet of things’ sensors, structural models, and environmental systems to provide responders and facility managers with real-time access to critical information. Simulation tests and real-world deployments have confirmed the platform’s ability to optimize evacuation routes, improve response times, and minimize risks during emergencies. Integration with GIS further supports risk mapping and post-disaster recovery efforts. This study proposes a scalable disaster management framework that promotes real-time data sharing and collaboration across stakeholders. Aligned with the trend toward smart, resilient cities, the platform provides practical solutions for improving disaster preparedness and response in high-rise and complex urban environments.
During the construction period, numerous site photographs are routinely captured; however, their use is largely limited to simple visual inspection of construction status. To enhance the practical utilization of such photographic information, this study proposes a 4D-based construction progress management system that visually evaluates schedule progress by integrating site photographs within a BIM-based information management framework. The proposed system synchronizes site photographs with corresponding 4D model images using coordinate linkage and applies deep learning–based object detection to identify matching construction elements. Construction progress is approximately estimated by analyzing bounding box overlap between detected elements in site photographs and planned elements in 4D model images. A case study conducted on a bridge construction project demonstrated that the trained model achieved an overall mAP@0.5 of 0.532, and that the proposed method enables intuitive and approximate progress evaluation. The results indicate that the proposed system can improve the usability of site photographs as supporting information for 4D-based construction progress management.