Hossam Wefki

Dr. Hossam Wefki

Civil Engineering Department, Port Said University, Port Said, Būr Sa‘īd, Egypt
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 February 2025 in Building and Environment
Verified
Journal Article
Closed access
MKMosbeh R. Kaloop
Mosbeh R. Kaloop
FAFurquan Ahmad
Furquan Ahmad
PSPijush Samui
Pijush Samui
EEEmad Elbeltagi
Emad Elbeltagi
JHJong-Wan Hu
Jong-Wan Hu
HWHossam Wefki
Hossam Wefki

13 January 2025 in Buildings
Verified
Journal Article
Open access
PDF file
HEHamdy Mostafa Elsharkawi
Hamdy Mostafa Elsharkawi
Emad ElbeltagiEmad Elbeltagi
Emad Elbeltagi
MEMohamed S. Eid
Mohamed S. Eid
WAWael Alattyih
Wael Alattyih
HWHossam Wefki
Hossam Wefki
Timely approvals and payments to the project participants are crucial for successful completion of construction projects. However, the construction industry faces persistent delays and non-payments to contractors. Despite the desirable benefits of automated payments and enhanced access to digitized data progress, most payment applications rely on centralized control mechanisms; inefficient procedures; and documentation that takes time to prepare, review, and approve. As such, there is a need for a reliable payment automation system that guarantees timely execution of payments upon the detection of completed works. Therefore, this study used a cutting-edge approach to automate construction payments by integrating blockchain-enabled smart contracts and scan-to-Building Information Modeling (BIM). In this approach, scan-to-BIM provides accurate, real-time building progress data, which serve as the source of verifiable off-chain data. A chain-link is then used to securely relay these data to the blockchain system. Blockchain-enabled smart contracts automate the execution of payments upon meeting contract conditions. The proposed approach was implemented on a real case study project. The actual site scan was captured using a photogrammetry 360° camera, which uses a combination of structured light and infrared depth sensing technology to capture 3D data and create detailed 3D models of spaces. This study leveraged accurate, real-time building progress data to automate payments using blockchain-enabled smart contracts upon work completion, thus reducing payment disputes by tying payments to verifiable construction progress, leading to faster release of payments. The findings show that this approach provides a transparent basis for payment, enhancing trust and allowing precise project progress tracking.

28 December 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Emad ElbeltagiEmad Elbeltagi
Emad Elbeltagi
HWHossam Wefki
Hossam Wefki
RKRana Khallaf
Rana Khallaf
Buildings represent the largest potential for carbon reduction worldwide. This highlights the need for a simulation and optimization method for energy management. The early design stage of buildings represents an important phase in which choices can be made to optimize design parameters. These parameters can focus on multiple areas, including energy and thermal comfort. This paper introduces the optimization of early-stage sustainable building design considering end-user energy consumption. It proposes an optimization model that integrates multiple layers, which consist of a parametric energy simulation, artificial neural network, and genetic algorithm. The proposed optimization model considers a single objective function to obtain the optimal design. The targeted goal is to obtain minimal energy consumption for residential buildings during the early design stages. Key design parameters of the building were identified for optimization and feasible ranges for them were obtained using genetic algorithms. Finally, the results of this paper include the identification of the optimal building design for the thermal comfort analysis and optimal energy performance. The model was applied to a case study in Egypt and the results showed that using the developed optimization model can lead to a 25% reduction in energy consumption.

19 October 2023 in Buildings
Verified
Journal Article
Open access
PDF file
MSMona Salah
Mona Salah
RKRana Khallaf
Rana Khallaf
Emad ElbeltagiEmad Elbeltagi
Emad Elbeltagi
HWHossam Wefki
Hossam Wefki
Construction site layout planning (CSLP) is the strategic arrangement and planning of construction site spaces, which has an enormous impact on the success of any construction project. Over the past two decades, multiple planning models have been developed to generate layouts that maintain safety and productivity within the construction environment. Yet these models vary significantly with disparate assumptions, many of which remain unstated. This study harnesses social network analysis (SNA) as a means to convert data into knowledge. It applies SNA to shed light on CSLP, providing a comprehensive overview of the existing models, and illuminating the critical parameters that should be considered in layout planning. This analysis delves deep into past methodologies and sets the potential for forthcoming research investigations. This study aims to be a reference for readers and researchers venturing into the realm of CSLP. Numerous related records and studies from diverse databases and sources were reviewed and analyzed. Out of these, 70 articles were singled out, from which 14 pivotal parameters were distilled as the foundation for any CSLP framework. Through the application of SNA, gaps within the existing research domain and literature were pinpointed. The study findings demonstrate the growing interest in shifting to cutting-edge approaches in CSLP. However, the results show that the majority of these models in the literature fall short of sufficiently addressing realistic facility representation, noise effects, or the construction impact on the surrounding environment. Accordingly, this research illuminates these knowledge gaps. The findings of this review guide future research by sketching a broad outline for future optimization models and planning studies.

27 July 2025 in Buildings
Verified
Journal Article
Open access
PDF file
HWHossam Wefki
Hossam Wefki
MSMona Salah
Mona Salah
Emad ElbeltagiEmad Elbeltagi
Emad Elbeltagi
MAMajed Alinzzi
Majed Alinzzi
The process of designing reinforced concrete (RC) buildings has traditionally relied on manually evaluating a limited number of layout alternatives—a time-intensive process that may not always yield the most functionally efficient solution. This research introduces a parametric algorithmic model for the automated optimization of RC buildings with solid slab systems. The model automates and optimizes the layout process, yielding measurable improvements in spatial efficiency while maintaining compliance with structural performance criteria. Unlike prior models that address structural or architectural parameters separately, the proposed framework integrates both domains through a unified generative design approach within a BIM environment, enabling automated evaluation of structurally viable and architecturally coherent slab layouts. Developed within the parametric visual programming environment in Dynamo for Revit, the model employs a generative design (GD) engine to explore and refine various design alternatives while adhering to structural constraints. By leveraging a BIM-based framework, this method enhances efficiency, optimizes resource utilization, and systematically balances structural and architectural requirements. The model was validated through three case studies, demonstrating cost reductions between 2.7% and 17%, with material savings of up to 13.38% in concrete and 20.87% in reinforcement, achieved within computational times ranging from 120 to 930 s. Despite the current development being limited to vertical load scenarios and being most suitable for regular slab-based configurations, the results demonstrated the model’s effectiveness in optimizing grid dimensions and reducing material quantities and costs, and highlighted its ability to streamline early-stage design processes.

7 May 2025 in Buildings
Verified
Journal Article
Open access
PDF file
HWHossam Wefki
Hossam Wefki
Emad ElbeltagiEmad Elbeltagi
Emad Elbeltagi
AEAhmed Elgamal
Ahmed Elgamal
MAMansour Alturki
Mansour Alturki
MAMohammed K. Alkharisi
Mohammed K. Alkharisi
MEMohamed T. Elnabwy
Mohamed T. Elnabwy
Selecting the appropriate excavation support system (ESS) is critical for ensuring construction projects’ safety and cost-effectiveness. Several dynamic factors influence this decision-making process, such as the groundwater table, excavation depth, proximity to neighboring buildings, and soil characteristics. In practice, the selection often depends heavily on the subjective judgment of experienced professionals in the construction industry. Although the analytical hierarchy process (AHP) is frequently employed to evaluate alternatives using multiple criteria, it fails to adequately account for the subjectivity and uncertainty in converting the decision-maker’s intuition into exact numerical values. To overcome this challenge, this study proposes an enhanced method known as fuzzy AHP. This approach is designed to capture the subjective experiences of experts better and effectively incorporate the uncertainties present in the decision-making process, ultimately aiding in identifying the most suitable ESS. A case study of excavation projects is also included to demonstrate the practical application of the proposed model. By presenting this approach, the study aims to raise awareness within the construction industry about the critical factors to consider when selecting the best excavation support technique for specific projects.